Laserfiche WebLink
SWRCB <br /> ,January 2002 Page of <br /> 6- PIPING SUMP TESTING <br /> Test Method Developed y: D Sump Manufacturer 0 Industry Standar7 <br /> fessional Engineer <br /> D Other(Spec) <br /> Test Method Used: D pressure D Vactium 939 Hydrostatic <br /> D Other(Specify} <br /> Test Equipment Used: NCUN TS-STS Equipment Resolution: 0.0001 11�".. w.-� ,k ,rtawaul'atac:a�znuens.�.�va,.:;nuv....at«vatal cw, y.nnasu;.�rcn,.�,rc.a.a5.5:e.:&,.F.:,mxer�;.rrcu:anvkrs+M,x'Pasenr+.aav°air-<'^zarzsv,na•,...au,w, <br /> Su p 2-91 Sump# Sump�# <br /> Sum 4211 <br /> Sum <br /> p 60 5Soe <br /> SumpMaterial: FRP FRP ,4 ` <br /> ..._...... <br /> Height from Tank Top to Top of 2211 1 8" Lj <br /> Hi est pi int k'enctxation <br /> Height from Tank Top to ctrical Low 3 0„ <br /> oci <br /> ElePenetration: 3211 <br /> Condition ofsump riortotesting: Clean Clean - <br /> POrtion of Sump Tested' 32®0 3411 - <br /> Does turbine shut down when <br /> sump sensor detectsliquid(both Yes `No 'NA Yes 0 No DNA. D Yes D No DNA Oyes D No° D . <br /> roduct and water?` <br /> Turbine shutdown response time s e c. 6 s e . <br /> Is system programmed for fail-safe Yes D No D NI TA <br /> shutdown?* Z Yes D No D NA 0 Yes D No DNA D Yes D No D N <br /> Was fail-safe verified to Yes 0 No C NA <br /> o erational?" -N Yes D No D NA D Yes D No D NA D Yes D No DNA <br /> Wait time betty applying <br /> pressure/vacuum/water and starting 1 Oma.n. 1 Omin. <br /> test: <br /> Test Start The: 9: 6m 10: 08am <br /> Initial Reading O: 4.2013" 6. 1637" <br /> Test End Tjme: 9:41 am 7 :23am <br /> Final Reading r}: 4.201 3" 6.163911 <br /> -- <br /> Test Duration: - 15mz . 15mi . <br /> Change in Reading r-&).- 0.0 0 0 0°' 0.0002" <br /> Pass/Fail aii Threshold or Criteria: *-0.0 0 2" ±0.0 2" <br /> Test Result: Pass D Fail a Pass D Fail D Pass ®Fail D Pass D Fail <br /> Was sensor removed for testing? EXYes D No D NA es D No D NA D Yes D No D NA D Yes D No D NA <br /> was sensor properly replaced and IXYes u No 0 NA <br /> verified functional after testin ? Yes D No D NA D Yes D No D NA D Yes D No DNA <br /> e is- (zncl a a o tzcaar on re �zrs rzor to testis > and recotn e allow-uoa for fa led tests) <br /> •;.` <br /> If the entire depth of the sump is not tested,specify how much was tested. Ifthe answer to ga of the questions indicated with.an <br /> asterisk( } C"or"NA",the entire sump must be tested. (See SWRCB SSC-160) <br />