Laserfiche WebLink
Local Guidance Letter (LG) 160 We believe a reasonable time within which to repair a <br /> secondary containment system is 30 to 120 days, depending on the type and the extent of the <br /> system failure, the repairs needed, and the time needed by local agency staff to review a repair <br /> permit application. <br /> 4 Secondary containment testing at Wilson Way was performed on July 22, 2005, and <br /> failures were not repaired until December 6, 2006. <br /> 4 Secondary containment testing at Charter Way was performed on September 19, 2005, <br /> and failures were not repaired until December 12, 2008. <br /> V. ATTACHMENTS <br /> Attachment 1 -July 9, 2002, routine hazardous waste inspection report for Wilson Way <br /> Attachment 2 - Permit application, SR0041059, to install probes for ELD testing <br /> Attachment 3- ELD test report dated February 22, 2005, for Wilson Way <br /> Attachment 4-July 22, 2005, secondary containment test results for Wilson Way <br /> Attachment 5-September 19, 2005, routine UST inspection report for Wilson Way <br /> Attachment 6 -September 19, 2005, monitoring system certification test report for Wilson Way <br /> Attachment 7-November 10, 2005, follow up letter to September 19, 2005, routine LIST <br /> inspection for Wilson Way <br /> Attachment 8-LIST-Facility form (Former Form A)and EHD facility information for new owner <br /> for Wilson Way <br /> Attachment 9-Notification for February 20, 2006, ELD test at Wilson Way <br /> Attachment 10-Permit application, SR0046523, to install additional ELD sample points <br /> Attachment 11 -Permit application, SR0046666, to break concrete for the exploration of a leak <br /> Attachment 12-July 17, 2006, line test report for Wilson Way <br /> Attachment 13-Permit application, 5R0047536, to replace the 87-octane sump sensor <br /> Attachment 14-ELD test reports received on February 15, 2007, for Wilson Way <br /> Attachment 15-August 30, 2006, SR0047536 permit inspection report <br /> Attachment 16 -November 7, 2006, routine UST inspection report for Wilson Way <br /> Attachment 17-November 7, 2006, routine hazardous waste inspection report for Wilson Way <br /> Attachment 18-Financial responsibility documents submitted in response to November 7, 2006, <br /> routine UST inspection report for Wilson Way <br /> Attachment 19-November 16, 2006, monitoring system certification inspection report for Wilson <br /> Way <br /> Attachment 20-November 16, 2006, monitoring system certification test report for Wilson Way <br /> Attachment 21 -Permit application, SR0048983, to replace 8-7 and 91-octane annular sensors <br /> and 91-octane leak detector <br /> Attachment 22 -November 30, 2006, SR0048983 permit inspection report <br /> Attachment 23- Items submitted on December 6, 2006, in response to the November 7, 2006, <br /> routine hazardous waste inspection for Wilson Way <br /> Attachment 24-Items submitted on December 6, 2006, in response to the November 7, 2006, <br /> routine UST inspection for Wilson Way <br /> Attachment 25-ELD test reports for Wilson Way submitted by Mr. Judge's attorney <br /> Attachment 26 -December 6, 2006, secondary containment test report for 87-and 91-octane <br /> piping for Wilson Way <br /> Attachment 27- Items submitted on December 28, 2006, in response to the November 16, 2006, <br /> 30 <br />