Laserfiche WebLink
0 <br /> SWRCB January 2006 <br /> Spill Bucket Testing Report For <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(f applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: Wilson Way Chevron Date of Testing: 02/13/2013 <br /> Facility Address: 437 N.Wilson Way,Stockton,Ca.95205 <br /> Facility Contact: Aman Mehroke Phone: 209-942-2344 <br /> Date Local Agency Was Notified of Testing: D —ta I—1 <br /> Name of Local Agency Inspector(ifpresent during testing): Jeff Wong <br /> 2. TESTING CONTRACTOR O TION <br /> Company Name: Reliable Petroleum Services Inc. <br /> Technician Conducting Test: Guadalupe Sanchez <br /> Credentials': x CSLB Contractor x ICC Service Tech. ❑SWRCB Tank Tester ❑Other(Spec) <br /> License Number(s): 883706 5250451-UT <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: xHydrostatic ❑Vacuum ❑Other <br /> Test Equipment Used: Standard Tape Measure Equipment Resolution:N/A <br /> Identify Spill Bucket(By Tank 1 TI:87 Fill 2 T2:91 Fill 3 T3: 4 T4: <br /> Number,Stored Product, etc. <br /> Bucket Installation Type: Direct Bury Direct Bury Direct Bury Direct Bury <br /> x Contained in Sump x Contained in Sump ❑Contained in Sump ❑Contained in Sum <br /> Bucket Diameter: 12" 12" <br /> Bucket Depth: 173/4" 15 '/2" <br /> Wait time between applying 1 minute 1 minute <br /> vacuum/water and start of test: <br /> Test Start Time(TI): 11:00 a.m. 11:01 a.m. <br /> Initial Reading(RI): 15" 12 ''/2" <br /> Test End Time(TF): 12:00 p.m. 12:01 p.m. <br /> Final Reading(RF): 15" 121/2" <br /> Test Duration(TF—TI): 1 hr 1 hr <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or 1/16" 1/16" <br /> Criteria: <br /> Test Result. x Pass ❑Fail x Pass ❑Fail Pass ❑Fail Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signa Date 02/13/2013 <br /> 'State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />