Laserfiche WebLink
a740A&Atul "Ag Oyattan S -VI UJIVOUtm 0 <br />F. In -Tank Gauging / SIR Equipment: <br />11 <br />1 .1 1 UMM4=0 <br />Complete the following checklist: <br />_.wwmw "VIT 65U%A TV num &u%;= urinacucam wcirc ur wui ue correctea. <br />G. Line Leak Detectors (LLD): <br />rnmnlate the Winw6cr r-hapirliv+- <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />'Were <br />low -ERIN <br />all tank gauging probes visually inspected for damage and residue buildup? <br />ra <br />Was accuracy of system product level readings tested? <br />Was accuracy of system water level readings tested? <br />Were all probes reinstalled properly? <br />INIMMM Were all items on the equipment manufacturer,s maintenance checklist compi eted? <br />_.wwmw "VIT 65U%A TV num &u%;= urinacucam wcirc ur wui ue correctea. <br />G. Line Leak Detectors (LLD): <br />rnmnlate the Winw6cr r-hapirliv+- <br />I �4tvu. <br />H. Comments: <br />Page 3 of 4 <br />UN -036 – 3/4 www.unidocs.org Rev. 01/17/08 <br />—Mrs <br />kNrI 0 Most <br />Were all LLDs confirmed operational and accurate within regulatory requirements—? <br />Was the testing apparatus properly calibrated? <br />For mechanical LLDs, does the LLD restrict product flow if it detecis�lea■ <br />k_? <br />f <br />For electronic LLDs, does the turbine automatically shut off if the LLD d■etects a leak? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is di sabled <br />or disconnected? <br />me rur6me, autornimatilelally _=shut -off if—any P_ ortion of the monitoring system malfunctio rs <br />or fails a test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />I �4tvu. <br />H. Comments: <br />Page 3 of 4 <br />UN -036 – 3/4 www.unidocs.org Rev. 01/17/08 <br />