My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:32:59 PM
Creation date
6/3/2020 9:58:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S':GRC 3. Januar-r '2002) <br /> 5. SECONDARY PIPE TESTING <br /> T st :vle:ltod De-ieloped By: C Piping Nlanufacturer Er5austry Standard 0 Professional Engineer <br /> 0 Other(Snecify) <br /> Test Method Used: ❑Vacuum 0 Hydrostatic <br /> Other(.specify) <br /> Test Equipment Used: e j Equipment Resolution: <br /> mmPiping Run# f Piping Run 9 Z I Piping Rnn # Piping Run.4 <br /> Piping:Material: � �, f L <br /> Piping Manudacnmtr: <br /> Piping Diameter: <br /> Length of Piping.Run: <br /> Product Stored: t 5) e-,— eA €C <br /> Method and location of <br /> pi ittg—nut isolation: T>�i'lS�Ci"i S..�t° o(- <br /> Wait time bem-een applying <br /> pressure%-acuum/n•ater and _ <br /> start Lug test: _ti r'•g • °r ," <br /> Test Start Time: 1 <br /> Initial Reading(Ri): j 5 P J <br /> Test End Time: <br /> r <br /> Final Reading(R.r): / <br /> Test Duration: <br /> Change in Reading(RF-F,4): (� <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: 'Pass 0 Fail ass 0 FAVf Pass G Rail. Pass 0 � <br /> COmmentS— iinc?ude information on repairs made prior to testing and recommended foilosv-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.