Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT LUD9 TESTING <br /> Test Method Developed By: 0 UDC Manufacturer Industry'Stannard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum ')(„Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> mmmUHC# t UDC# UDC# UDC# )j <br /> UDC_Manufacturer: <br /> UDC Material: <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: +Y 1 <br /> Height from UDC Bottom to <br /> Lo�e-est Electrical Penetration: <br /> Condition of UDC prior to <br /> tes(in.R: C G +^ <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both 0 e o 0 NA ❑Yes 0 No ❑NA; 0 Yes 0 No es 0 No C]NA <br /> product and water)')' <br /> Turbine shutdown response tune <br /> Is sN-stent progranuned for fail- 0 Yes 0 No 0 Yes ❑No ❑NA ❑Yes 0 No CJ Yes (]No i-1 NA <br /> safe shiiidown''' _ <br /> Was fail-safe verified to be s 0 No 0 NA ❑Yes 0 No 0 NA ❑Yes 0 No 0 NA 0 Yes U o A <br /> operational?' <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test n ,•. s <br /> 30 <br /> Test Start Time: 1 t7 <br /> Initial Reading(R{): ! <br /> Test End Tine: at as) Z40 <br /> Final Reading(Rr): <br /> Test Duration: ( r <br /> Change in Reading (R,,-R,): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: I 0"Pass 'Cl Fail pan Q Fail Bass 0 la ail ur Pass 0 Pail <br /> Was sensor removed for testing'? 0 Yes 0 No ❑NA ❑Yes 0 No 0 NA 0 Yes 0 No ❑NA 0 Yes 0 No CJ NA <br /> Was sensor properly replaced and Oyes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes (1 No Q NA <br /> verified fiutctiot>al after testis '? <br /> Comments— (include information on repairs made prior,t6 tesWng, i id recommended follow-up for failed tests) <br /> If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />