Laserfiche WebLink
# <br /> all <br /> 77;1 MM <br /> FWAM iring been inspected for proper entry and termination,Includmg testing fo1 • Ft <br /> faults? <br /> M AM <br /> A items on the equipment manufactmes maintenance cheddist completed? <br /> 0 No* For equipment st=-up or annual equipment certification, w2s a leak simut-ded to verify LLD <br /> 0 0.2 gp.h.3 <br /> 0 N/A (Check all that apply) Sinuilated leak rate: 011--pJL'; 0 0-1 &p.h.2� <br /> Notes: L Required for aFdPMC=.S=-ZEE=tifiC2fiM- 2ndannualcertificatiou- <br /> I Unless mandatedby local agency,certification requir-ed-Only-for-electronic UM Stan-W. <br /> HIM For mechanical LLDs,does the LLD restrict product flow if t a leak? <br /> 0 For electronic LIDs,does the turbine automatically shitt off if the I.LD detects a leak? <br /> 0 For electronic LLDs,does the turbine automatimlly shirt off if any portion of ft mom systeinn is led <br /> or disconnected? <br /> For elec�- nk LLDs, does the turbine auXOJ112tically shut off -if any portion of the monitonng system I <br /> malflinctions or fails a test? <br /> For electronic LLDs,have all acce.%-R)le wiring Connections been visually inspected? <br />