Laserfiche WebLink
APR-30-2010 FRI 05; 28 PM P, 012 <br /> �1�lC <br /> Page 7 of 14 <br /> 11. PIPINGSUMPIESM <br /> Test Method Developed By: D Sump ManvWturer ®industry Standard ❑Professional Engineer <br /> Q Other(SM*) <br /> Test Method Used: Q Pressure O Vacuum ®Hydrostatic <br /> Q other(SpwifY) <br /> Ted Equipment Used, Caldwell Level Change Indicator tResolution*0.0025 <br /> Sump S Sump 6 Sump Sump <br /> 75813,unmVDiamte, 42" 42" <br /> 59" 59"Su al: Fibs lass Fiberglass <br /> Height from Tank Top to Top of 28" 28„ <br /> H' hest PjR" g Penetration: <br /> Haight from Tank Top to Lowest 8" 8" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry <br /> Portion of Sump Tested' 2"above product 2"above product <br /> Oow turbine slut down when sump <br /> UnSot detects liquid(lith product and U Yes Q No M NA Q Yes ®No MNA Q Yes Q No Q NA O Yes D No Q NA <br /> 7 <br /> Turbine shutdown response time Sae comment <br /> Issystemprogrammed for fait-safe Cl Yes M No (W HA 0 Yes Q No ® NA Q Yes Q No Q NA O Yes Q No Q NA <br /> ?• <br /> Was fora-safe-Verified to be Cl Yes 13 No IM NA ®Yes t]No M NA Q Yes Q No 0 NA 0 Yes Q No Q NA <br /> l7 <br /> WaitIme between apply <br /> pressurWyacuumMster and starting 5 min 5 min <br /> tag <br /> Test start Tuna: 2.00 PM <br /> Initiaal Reading 0.0025 <br /> Test End roe: 2:30 PM <br /> Final Reading(RF): 0.0025 <br /> Test DurA= 30 min <br /> Changs in Ruing(R�-R�y Q <br /> Pass/Fall Threshold or Criteds: 1/1.6 hr 1/16 hr <br /> Yom' WRuss,O Fail t -Ra9 O Fall:' Cl Pass Q Fall Q:Pas& D Fall' <br /> Was sensor remved for to j? ®YON D No Q NA ®Yes O No t3 NA 0 YQ8 ®No O NA 13 Yes Q No Q NA <br /> Was seer p"rfy replaced Stu <br /> ted!q?, , M Yes Q No O NA 10 Yes 0 No Q NA Q Yes Q NO Q NA a Yes Q No Q NA <br /> Comments—(i B i NGl orr mete to testinsr attd leca folbha+•tm fot tiled tests) <br /> Turbine shut down done during Annual Monitoring certification. <br /> Sump 6 cannot be tested bad penetration boot 4g. <br /> 'If the entire depth of the sunup is not tcttvd,q=ify how much was tested. if the answer to MY of the questions indicated with an <br /> sstmisk(*)is"NO"or"NA",the Mire sump must be tested. (See SWRCS LO-160) <br /> U/sla 39Vd •SIH xonHo MEE68199 sE:et ®ZOZ/ZZfv® <br />