Laserfiche WebLink
APR-30-2010 FRI 05: 29 PM P. 015 <br /> ftgu 10 of 14 <br /> 114. UNDF&DOVISER CONTAINMENT(gMTEVING <br /> Test Method DevelopeW—W. C3 UDC Manu*turer 0 Industry Standard Engineer <br /> 0 Other(Spe*) <br /> Ted Method Used: 0 Presm 13 Vacuum M Hydrostatic; <br /> a 06W(SPWW <br /> Test Equipment Used: Lake Test Equipment Resolution: <br /> 13-14a UDC#14-15a UDC 0 15-26a VOC# 16-17a <br /> RM rer, Bravo Bravo Bravo Bravo <br /> igi� st"I Steel Steel Steel <br /> VDD 11" 11" <br /> Height from UDC Bottom to Top of 0 0 0 0 <br /> nhet M9 Penetration; <br /> Height from 1.100 Bottom to Lowest 0 0 0 0 <br /> Eleabical Penetration: <br /> -ti6—fton of UDC prior to testing -D r 0 Dry Dry <br /> P;Rmn Fof 015c Tested' 2" above Product -2"above product 2"above Rroduct 2" above vroduct <br /> Does turbine shut down when UDC <br /> rd liquid(both product U Yes Q No 131 NA CI Yes 13 No 0 NA 13 Yes Q No M NA C3 Yes Q No M NA <br /> and water)?, <br /> TUMN shuw"mense on See comment <br /> Is system programmed for fal6wft Cl Yes Q No 0 NA 0 Yes U No M NA M Yes C3 No Q NA 13 Yes U No Q NA <br /> shut[k=7 <br /> Was—w.&*VORW to be 13 Yes 13 No 10 NA 0 Yes 0 No 13 NA Q Yes 11 No U NA U Yes Q No Ck NA <br /> operadmial? <br /> Wait time bahvm apofing <br /> pressuref4acuutrMter and starting 9 min 5 min 5 min 5 min <br /> test <br /> Test fto Time: 4,.00 PM 4.00 PM 4:00 PM 4:00 PM <br /> Initial"i2q(RL_ 7112- 7" 70 7 3 8- <br /> Ted End Time- 5:00 PM 5:00 PM 5:00 PM5:00 PM <br /> Final Reading ORP): 7 1/2" 7W 7N 7 3/8ff <br /> Test Duradw, I hr I hr I hr I hr <br /> Change inM(Pj6ft): 0 a 0 0 <br /> PassFd Thmshold or Criteria; 1/16 hr 1/16 hr 1116 hr 1/16 hr <br /> Ted Remit —Paw-DPW I- 5 Fail- 111 Pass Q.Foil:• W.Paw •Cl Foil, <br /> Was sensor removed for teAna? 1 G YeS 0 No W—NA I-10 Yes 12 No 09 NA U Yes 13— No 0 NA U Yes a No ag NA <br /> W83 sensor property replaced afW <br /> N'tadm? I Q Yes Q No M NA 0 NA Q Yes Q No 0 NA 0 Yes E3 No 0 NA <br /> Commwft—kgdeinformation on rePairs ffxWe 02�to testing wd m=nmeflded f0fibL42 for Wed k& <br /> Turbine shut down during Annual monitor certification. <br /> 'Ifthe entire depth'ofthe UDC is not tested,specify how much was tested. If the answer tonyofthe questions indicated with an <br /> aswdsk(*)is"NO"or'INA",the entire UDC must be tested. (See SWRCS LO-160) <br /> CZ/tT 39Vd -17111-1 >113ni-10 SZ9CIESST99 5e:21 0T0z/zz/t;0 <br />