Laserfiche WebLink
APR-30-2010 FRI 05: 33 PM P. 022 <br /> Page 3oflt mm"C� <br /> 5. SECONDARY PIPE TESTING <br /> Test Medvd Devek"d By: a Piping Manufacwrer 0 Industry S M Professional Engineer <br /> 0 Other(SM*) <br /> Test Memod Used, 0 Pressure C1 Vacuum 0 Hydrostatic <br /> ck Otor(Spa*) <br /> Test Equiprnem-Used- ma Gavage Equipment Resolution: o-3o psi <br /> Piping Run tE Piping Run 0 Piping Run# PIPing Run <br /> piping : <br /> !�Wiak <br /> a mgmu <br /> U, <br /> faojw. 1 <br /> F-4*Q Diameter. <br /> P_ i7 <br /> P:g m <br /> Lao of PlpiN Run: <br /> Product Stored: <br /> Methad and location of pipkV- <br /> run 150wion: <br /> Waft iftne bdmen applying <br /> unrhrater and <br /> stmng teat: <br /> Ted Start 1-irne- <br /> Iniftl Reading(Ri): <br /> -Test End TIM, <br /> Final RAwAIng(k). <br /> Ted DurAon- <br /> CtsanS2 in Reaft(fba); <br /> Pass/Fag Tbwhold or OWN.. <br /> Test IC Cl i3•F$il 12-Pass:U Fall Pass 0 Fail 13 RMS a Fall <br /> Commoift-(include informafion on&Mrs made Mato j!US and mmmmided folow-up for Wed LqA <br /> EZ/ST d -MIH >DnHO SUEE15ST99 96:OT OTOZ/ZZ/tG <br />