Laserfiche WebLink
APR-30-2010 FRI 05. 40 PM P. 035 <br /> �P®C <br /> Pagge 7 of 8 "" <br /> 9. SP1LLlOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested E3 <br /> Test Method Developed By: Ca Spill Bucket Manufacturer ❑ Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution; <br /> IWO IF Spill Sox# Sp(Il Box# Spill Box# Spill Box# <br /> Bucket Diameter. <br /> Bucket Depth: <br /> wait time between applying <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RpRi): I <br /> Pass/Fail Threshold or Criteria: <br /> Tog Result: Q Pass D Fail ❑Pass ❑Fall: ®.Pass.'❑Fall ❑Pass 0 Fail <br /> Comments—(include information on repairs made poor to fesfing,and recommended follow-up for failed tests) <br />