Laserfiche WebLink
u«/uu/cozo rso zz,00 FAX 2094683433 nzc 000 0001 <br /> FAX TX REPORT <br /> TRANSNISSION OK <br /> JOB NO. 3356 <br /> DESTINATION ADDRESS 99433003 <br /> DESTINATION ID <br /> ST. TIME 04/22 11:25 <br /> USAGE T 00' 32 <br /> PGS. 2 <br /> RESULT OK <br /> San Joaquin County <br /> �����^���������t�� ����Uth ������w������ ome �R <br /> Environmental — Department oonnanvmn nson <br /> 600 East Main Street <br /> Stockton, PROGRAM COORDINATORS <br /> California����� �����~���� nv�nm«o�mn.nsxw« <br /> Jmnnunuoomo.nsHo.no/ <br /> Website:wxuooyro|ovns*s <br /> moma�muoq�bhd <br /> Phone: (209)408-342O <br /> April 22, 2010 Fax: (2D9)464'0138 <br /> Melissa Brueckner <br /> APEC <br /> P.O. Box 55105 <br /> Stockton, CAQ52O5 <br /> Re: Tracy Truck 8Auto Stop SR0059730 <br /> 3Q40N. Tracy B|vd.. Tracy <br /> The San Joaquin County Environmental Health Department(EHD)has completed the review of <br /> the application for a permit to repair or replace floats in the under dispenser pans on the <br /> underground storage tank(UST)system etthe above noted address. The permit has been <br /> approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior tocommencing work. All new addenda supersede the previous ones. <br /> 3. Contact Stacy Rivera at(2O9)408-344Dtoarrange the following inspection <br /> appointments/m48-hournotice iorequired for inspection appninbmente\ Please be <br /> aware that inspections for emergency work must be scheduled within five days of permit <br /> approval. <br /> a. Float functionality: Functionality of the monitoring system must be verified to ensure <br /> that monitoring has been restored to meet the requirements of Title 23 California <br /> Code mfRegulations and the Health &Safety Code. <br /> 4. If concrete will be broken near the under dispenser containment(UDC), a secondary <br /> containment test must be performed on the UDC and/or piping once concrete is poured <br /> inaccordance with the manufacturer's guidelines. <br />