Laserfiche WebLink
SWRCB,January 2002 Page 4 of/ <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Nitrogen with 4"gauge apparatus Equipment Resolution: 0 <br /> Piping Run# 1-87 Piping Run#2-91 Piping Run#DSL Piping Run#DSL <br /> im <br /> West East Si hon <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: AO Smith AO Smith AO Smith AO Smith <br /> Piping Diameter: 3"over 2" 3"over 2" 3"over 2" 3"over 2" <br /> Length of Piping Run: 125' 125' 95' 95' <br /> Product Stored: 87 91 Diesel Diesel <br /> Method and location of Test Boot 'Fest Boot Test Boot Test Boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> starting test: <br /> Test Start Time: 11:15 AM 10:47 AM 1:00 PM 1:45 PM <br /> Initial Reading(Ri): 5 psi 5 psi 5 psi 5 psi <br /> Test End Time: 12:15 PM 11:47 AM 1:20 PM 2:45 PM <br /> Final Reading(RF): 5 psi 5 psi 0 0 <br /> Test Duration: 1 Hour 1 Hour 20 Minutes 1 Hour <br /> Change in Reading(RF-RI): 0 0 -5 psi 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> hNIS s rl t {''III : J tl Mt ri 3 fl !it <br /> � q{"i .. "n x' Y'z. ri�!k k._". ry� 'c;? ru <br /> s:.,;,$ ..a, >, ,..,.. ,�,t�✓,,".,;a..,�+,t i ;idaXhd� N i �,����$�,�i,l�i.,�n'd�113�h�" .� ,,�`dSS,yr.�z::���8���. i 0 h�}"ySt�:pi�,rt,�,' <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> R 0 9 2015 <br /> k <br />