Laserfiche WebLink
SWRCB,January 2002 Page 13 of 1 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Eq uip ed With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑ Other(Spec)Incon <br /> Test Method Used: ❑Pressure ❑Vacuum ❑ Hydrostatic <br /> Other(Sped) <br /> Test Equipment Used: Equipment Resolution: <br /> TiTBOX# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> .,: x.n;. �3 <br /> Comments—(include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br /> 9 2015 <br />