Laserfiche WebLink
Vmi ARM-4073 Automatic Repressurization Module <br /> All fuel delivery systems are affected by thermal contraction.Thermal contraction of fuel in a pipe system <br /> results in the loss of line pressure. In extreme conditions this can occur in a matter of minutes. Pressure loss <br /> results in the resetting of mechanical leak detectors to their slow flow position. For a leak detector to step <br /> through to its full flow position, the pipe must be repressurized.The repressurization of the line must occur <br /> while the leak detector is in a slow-flow/leak search position to assure EPA hourly line leak detection.When <br /> repressurized in this manner, the leak detector will differentiate between leaks above the EPA threshold and <br /> thermal contraction. <br /> An appropriate amount of time must pass to allow the leak detector to reset if a leak is present. During <br /> installation,this time is determined by taking a bleed-back(resiliency) measurement of the pipe. Using a table <br /> supplied in the installation instructions,the technician sets the appropriate delay time between repressurization <br /> cycles. By cycling the submersible pump in this manner,the line stays pressurized, slow flow is avoided and <br /> line leaks are identified. <br /> During the repressurization cycle, the ARM-4073 allows control of the submersible pump run time, 30 <br /> seconds or 70 seconds. Easy Installation! Installation setup to meet site conditions! <br /> Works with Vmi 99 LD-2000 or 99 LD-3000 mechanical leak detectors-Does not interfere with the <br /> operation of these Vrni leak detectors. <br /> Eliminates dispenser slow flow problems-Unique timing module allows pump to cycle automatically, <br /> keeping the line pressurized even during extreme thermal contraction. <br /> Eliminate need for costly solenoid delay replacement-Instead of replacing each existing fixed solenoid <br /> delay for each hose, only one ARM-4073 is needed for each turbine. Each dispenser must have at least a 3 <br /> second solenoid delay. <br /> Works with any pumping system -The ARM-4073 operates by controlling the coil of the pump relay. <br /> Installation instructions discuss integration with station emergency shut-off switch. Designed for use in a non- <br /> hazardous environment. <br /> High bleed-back in piping system - Line resiliency (bleedback) can cause a leak detector to take an <br /> extremely long time to step through if it has reset.Additionally, high resiliency may require the use of a slow <br /> leak detector to detect a leak. Repressurization by the ARM-4073 overcomes these conditions to keep the <br /> line pressurized and ready to deliver fuel unless a leak is present. <br /> Aboveground Storage Tanks-Piping above grade,exposed to the elements,subjects the line to extreme <br /> thermal contraction conditions. Use of the ARM-4073 will reduce or eliminate slow flow problems. <br /> Loading Racks are magnets for thermal contraction problems. Due to the exposure of the above ground <br /> piping, thermal contraction can be extreme.When used with a solenoid valve, the ARM-4073 keeps the line <br /> pressurized to the solenoid valve continuously. <br /> *The ARM-4073 installation instructions must be followed to assure proper operation.These <br /> instructions include a bleedback table to establish minimum delay times. Upon completion of <br /> installation, a leak detector test is required to assure proper performance of the leak detector. <br /> (Please see Vmi LDT-890 leak detector testing instructions and test form.) <br /> VM Vaporless Manufacturing, Inc. Toll Free: 1-800-367-0185 <br /> 8700 East Long Mesa Drive Phone: (928) 775-5191 <br /> Prescott Valley,Arizona 86314 Fax: (928) 775-5309 <br /> 02108 Web Site: www.vaporiess.com a Email: vmi@vaporiess.com <br />