My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:52:42 PM
Creation date
6/3/2020 9:59:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
517
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin <br /> .` Environmental Health Department DIRECTOR <br /> ® Hazelton BU Donna Heran,REHS <br /> F• 9 ..: <br /> Stockton, California PROGRAM COORDINATORS <br /> Robert McClellon.REHS <br /> ` Jeff Carruesco,RENS,RDI <br /> Website: .Sjgov.org/ehd Kasey Foley,REHS <br /> Phone: (209)463-3420 Linda Turkatte,REHS <br /> Fax: (209)464-3433 AQf IVED <br /> APPLICATION FOR UNDERGROUND STORAR <br /> RETROFIT OR PIPING REPAIR PERMIT OCT 3 1 2014 <br /> [] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. O <br /> applicant with comments. <br /> DEPARTMENT <br /> [] 2. Include a detailed site map on a separate sheet of paper showing all work to be done. Include the location of <br /> the tanks(s), piping, all tank-related appurtenances, streets, adjacent properties(north toward the top of the page), <br /> nearby septic tanks, leachfields, water wells, buildings, underground public utility lines (including water, sanitary <br /> sewer and storm sewer), and distance of piping from tank to dispensers. If underground utilities are not included <br /> on the site map,you must state in writing that USA Dig will be contacted prior to excavation activities. <br /> [] 3. Complete pages 3-6, "APPLICATION FOR UNDERGROUND STORAGE TANK RETROFIT OR PIPING <br /> REPAIR PER IT". OTE: If samolina is reaui sapllna firm shall be an Inde ndent third party from the <br /> ontractoLperforming the work <br /> (] . Complete page 7, "Authorization to else". This form must be signed and dated by the <br /> OWNERIOPERATOR of the facility. <br /> [] <br /> S. Submit a completed"Service Request'form and"Underground Storage Tank Program Fee Worksheet,,. <br /> [] 6. If performing any excavation activities, and the facility is located outside of the city limits, submit a "Backfill <br /> cavati nifiic e" as required by the San Joaquin County Building Department. If a "Backfill cav ti n <br /> Certificate'* is required by any incorporated areas (cities), submit to the appropriate City Building Departments, <br /> pursuant to the Uniform Building Code STD 70-11. <br /> [] 7. The maximum review time for Plan Review is 15 working days from receipt of the adequately completed plan. If <br /> gross deficiencies are identified, an addendum will be required with a $125.00 per hour fee and the review will <br /> begin on the date of resubmittal. <br /> [] 8-Advance Inspection tic t least 48 hoursis requiredEnvironmental i <br /> th <br /> Department(EHD). <br /> [] 9. Contractor to Provide: Combustible/Flammable gas detector (to verify the Lower Explosive Limit (LEL) <br /> atmosphere and oxygen level), adequate number(s) and appropriate type(s) of fire extinguisher(s), and barriers to <br /> secure the area as necessary to minimize traffic and pedestrian interference. It shall be the project managers <br /> responsibility for compliance with all health & safety regulations and requirements, including confined space <br /> requirements, which shall be strictly adhered to at all times during the course of the underground storage tank <br /> (UST)activities. <br /> [] 10.The EHD permit shall be on site during all UST permit-related activities. <br /> [j 11.Any changes in this document shall be approved by the EHD prior to initiating work. All changes to any work <br /> must be described in detail on pages 3&4 and be shown on the detailed site map. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.