Laserfiche WebLink
RECENED <br /> OCT 3 1 2014 <br /> ALTH <br /> 1. Using wire nuts,connect the two-wire sensor cable to the field wires in the sensor junction box(see Figure 2).Note,the <br /> Sump Sensor wiring has no polarity. <br /> I"I Black <br /> --7 <br /> TO Console i Seal off From <br /> Red Sensor <br /> 1l2'rigid <br /> conduit <br /> EPDXY sealed connections in a <br /> weatherproof junction box <br /> Figure 2. Sensor Field Wiring Diagram <br /> 2. Do NOT terminate drain wire at this location,ground drain wire at console only. <br /> 3. Seal wire nuts with epoxy sealant following the instructions in Figure 3. <br /> 15 (:k url <br /> CAUTION:Epoxy sealant is irritating to eyes,respiratory system,and skin.Can cause allergic skin reaction. Contains:epoxy <br /> resin and Cycloaliphatic epoxycarboxylate.Precautions: Wear suitable protective clothing,gloves,eye,and face protection. <br /> Use only in well ventilated areas.Wash thoroughly before eating,drinking,or smoking. <br /> 4. Push the epoxy sealed bag into the junction box.Replace and lighten the junction box cover. <br /> CFrom probe, <br /> sensor,or <br /> transducer To console <br /> Make sure that <br /> the ends of cable <br /> sheathing are sub- <br /> merged in sealant Tie wrap <br /> Wire nuts <br /> Instructions: <br /> NOTE: When temperature is below 50°F (10*C), keep 4. Mix thoroughly to a uniform color by squeezing <br /> resin in a warm place prior to mixing (e.g., in an contents back and forth 25-30 times. <br /> inside pocket next to body). 5.Squeeze mixed,warm resin into one end of bag and <br /> 1.Open epoxy sealant package,and remove resin pak. cutoff other end. <br /> 6. Slowly insert wiring connections into sealing pack <br /> 2.Holding resin pak as shown in A,bend Pak along long until they fit snugly against the opposite end as <br /> length. shown in C. <br /> 3. As shown in B, firmly squeeze the RED SIDE of the 7.Twist open end of bag and use tie wrap to close it off <br /> resin, forcing it through the center seal and into and position the fie wrapped end up until the resin <br /> BLACK SIDE. jells. -Ies�epxy2w.eps <br /> Figure 3. Epoxy Sealing Field Connections <br /> 5. Consult the appropriate console site prep manual to connect the Sump Sensor to the console. <br /> 5 <br />