Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: Z Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed N in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> 11 Yes 0 No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> U1 Yes 0 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> n Yes M. <br /> 0 No* Was accuracy of system product level readings tested? <br /> 1-1 Yes -- No* Was accuracy of system water level readings tested? <br /> 0 Yes 0 No* Were all probes reinstalled properly? <br /> 0 Yes 0 NW Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): FJ Check this box if LLDs are not installed. <br /> Corn tete the following checklist: <br /> 0 Yes F1 No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check a# <br /> 0 N/A that apply) Simulated leak rate: 0 3 g.p.h.; 0 0.1 g.p.h; tJ 0.2 g.p.h. <br /> 0 Yes cl No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 0 Yes 9 No* Was the testing apparatus properly calibrated? <br /> 0 Yes '] No* For mechanical LLDs,does the LLD restrict product flow K A detects a leak? <br /> 0 NIA <br /> 0 Yes 0 No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 N/A <br /> 5 Yes 0 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> 0 NIA disconnected? <br /> Ej Yes F,1 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> 0 N/A fails a test? <br /> ❑ Yes o No* For electronic LLDs,have all accessible Wring connections been visually inspected? <br /> 0 N/A I <br /> j No' I Were all items on the equipment manufacturers maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 2/21/07 <br /> .......... <br />