My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:52:42 PM
Creation date
6/3/2020 9:59:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
517
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: Z Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed N in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> 11 Yes 0 No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> U1 Yes 0 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> n Yes M. <br /> 0 No* Was accuracy of system product level readings tested? <br /> 1-1 Yes -- No* Was accuracy of system water level readings tested? <br /> 0 Yes 0 No* Were all probes reinstalled properly? <br /> 0 Yes 0 NW Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): FJ Check this box if LLDs are not installed. <br /> Corn tete the following checklist: <br /> 0 Yes F1 No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check a# <br /> 0 N/A that apply) Simulated leak rate: 0 3 g.p.h.; 0 0.1 g.p.h; tJ 0.2 g.p.h. <br /> 0 Yes cl No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 0 Yes 9 No* Was the testing apparatus properly calibrated? <br /> 0 Yes '] No* For mechanical LLDs,does the LLD restrict product flow K A detects a leak? <br /> 0 NIA <br /> 0 Yes 0 No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 N/A <br /> 5 Yes 0 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> 0 NIA disconnected? <br /> Ej Yes F,1 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> 0 N/A fails a test? <br /> ❑ Yes o No* For electronic LLDs,have all accessible Wring connections been visually inspected? <br /> 0 N/A I <br /> j No' I Were all items on the equipment manufacturers maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 2/21/07 <br /> .......... <br />
The URL can be used to link to this page
Your browser does not support the video tag.