Laserfiche WebLink
IFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VT. UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54a <br /> C31.CONTINUOUS ELECTRONIC MONITORING ; 2.FLOAT AND CHAIN ASSEMBLY M 3.ELECTRONIC STAND-ALONE 490s41, <br /> ❑4.NO DISPENSERS E399.OTHER S <br /> - -_ -1 lle�ltfK)------------------------------------------------------------- -- ------ <br /> PANEL MANUFACTURER: ------- --------------------------------------------------- <br /> ------ —------------------------------------------------------—---------—----------—------ MODEL 9: 400-56 <br /> LEAK SENSOR MANUFACTURER: 490-57I _--------------------------------------------------------- <br /> I MODEL#(S): <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS E3 a.YES b.NO 490-5° <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN J&a.YES 0 b.NO 49MO, <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES W.NO 41M.61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a YES R b.NO <br /> 2.UDC CONSTRUCTION IS XI,SINGLE-WALLED []2.DOUBLE-WALLED <br /> IF DOUBLE WALLED: <br /> UDCINTERSTITIAI SPACE IS_MO_NITOREDBY:__Q_j, El <br /> -------- ----------------- _jtIQUID E 2. PRESSURE 3.VACUUM <br /> ------------ --------------------- ------------------------------------------------------------------------- <br /> -A LEAK WITHIN THE SECONDARY CONTAINMENT THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS Ela.YES Ob.NO 4')0-64b <br /> VII. PERIODIC SYSTEM TESTING <br /> Lj 1. ELD TESTING: THIS FACILITY HAS BEEN OTIFI <br /> _LEA D ED BY THE STATE WATER RESOURCES CONTROLARD THAT ENHANCED 4')0-6S <br /> �T]�C <br /> ---------- <br /> TION(ELD MUST A _D. PERIODIC ELD-I-S-PER-FORMED-EV-ERY-36-MONTHS_ <br /> S- ------E_UIR!�P_-(2_3_CCR.§26_44.1) <br /> X1 SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY36MONTHS 490-66 <br /> ..................j---------------------------------------- ---------------------------------------------------------------------------------- <br /> 490-67 <br /> VIII.RECORDKEEPING — <br /> fo'lowm�m,,,, <br /> The following monitoring/mainteriance records are kept for this—facility <br /> Ig <br /> The <br /> logs 49M8, %ViSLI21 Inspection Records 490-68b n Tank integrity testing results 490-68c <br /> SIR testing results(and supporting documentation records), 490.69d n Tank gauging results(and supporting documentation records). 490-68e <br /> ATG Testing results(and supporting documentation records).490-68r El Corrosion Protection 60-day 109S 490-68g <br /> Equipment maintenance and calibration records. 490-68h <br /> IX TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their duties.? 490 6 EFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) -9, <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> 0 CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> D STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> 1:1 SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490.69g <br /> 0 OTHER(Specify):M69h,M69i <br /> This facility <br /> has a"Designated UST Operator"who has passed the California UST System Operator Exam administered b <br /> he Designated UST Operator"will train facility employees ill the Proper operation and maintenance of the LIST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: Code Council(ICC), <br /> > Operation of the UST'systems in a manner consistent with the facility's best management practices <br /> > The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> > The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> P, <br /> contact person(s)for emergencies <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide o v:_..:dL:ad�idl,,­­o <br /> tl I'll,comm <br /> information oil specific;in 011i101`1 119 procedures are attached to this plan.490-n <br /> tuft�0 <br /> r7 VV� <br /> X1.PERSONNEL RESPONSIBILITIES <br /> r ope <br /> r7this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly, ent covered by <br /> The USTOwner/Operator is responsible for ensuring that 1)thedaily/routine USTmonitoringactivitics and maintenance of UST leak detection equipment <br /> 'File following person(s)are responsible for performing the monitoring - <br /> N NAME ng and equipment maintenance: <br /> NAME LA'T L=4\ 49o-7b<TITLE <br /> 490-74;cTITLE 490-73 <br /> The Designated Operator shall perform a monthly visual inspection of the ficility, provide a report to the owner/operator, and inform the owner/operator of anv <br /> conditions that need follow-up action, <br /> de additional comments here or indicate h-1111,T1,1111 ——————T— <br /> P1191.1mhaddltl0nal <br /> ?V&-han I <br /> d"con <br /> '�hc following person(s) <br /> are <br /> NAME <br /> NAME <br /> The Designated Operator h, <br /> , it'. <br /> 'ond n,that need follow_. <br /> Er/,,per,,)r an, <br /> X11.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best f my <br /> PPLICA SIGNATUR <br /> 400-76 DATE: <br /> At .190-77 <br /> APPLICANT NAME(print): 490.78 <br /> APPLICANT TITLE: 400-79 <br />