Laserfiche WebLink
April 6, 2012 <br />San Joaquin County <br />Environmental Health Department <br />.11 East Main Street <br />Stockton,California95202-3029 <br />Timonthy Perry <br />Fillner Construction Inc <br />4470 Yankee Hill Road Ste 200 <br />Rocklin, CA, 95677 <br />- ,. .;11 . <br />Phone:1• f <br />f'464-0138 <br />Re: Tracy Truck Stop <br />3940 North Tracy Blvd, Tracy, CA, 95304 <br />DIRECTOR <br />Donna Heran, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, RENS, RDI <br />Kasey Foley, REHS <br />Linda Turkatte, REHS <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to replace the east diesel spill bucket on the underground storage <br />tank (UST) system at the above noted address. The permit has been approved with the <br />following conditions: <br />1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Thuy Tran at (209) 468-8257 to arrange the following inspection appointments <br />(a 48-hour notice is required for inspection appointments). Please be aware that <br />inspections for emergency work must be scheduled within five days of permit approval. <br />a. Corrosion protection: Verify corrosion protection for direct bury spill bucket prior to <br />backfilling. <br />b. Spill bucket test: Verify minimum 5 -gallon capacity and pass a one hour hydrostatic <br />test (or equivalent). Proper drainage must also be verified. <br />c. Secondary containment testing on east diesel tank. <br />Please be aware that the facility cannot receive fuel in the east diesel tank prior to <br />the EHD inspection and approval. <br />4. Since concrete will be broken near the east diesel tank, a secondary containment test <br />must be performed on the east diesel tank once concrete is poured in accordance with <br />the manufacturer's guidelines. <br />