Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN 2.CHANGE OF INFORMATION 0-90-1 <br /> Y9 <br /> PLAN TYPE K 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> 1. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) faki MPA nild I 1AAM t <br /> 3. <br /> BUSINESS SITE ADDRESS 1° CITY ��L 104. <br /> L <br /> H.EQ MENT T STING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 2( 3 CCR§2632,2634,2638,2641) <br /> MONITORING EQUIPMENT IS SERVICED -- _- 1.ANNUALLY ❑ 99.OTHER ci 490-30- <br /> (SI� �)� 490-36 <br /> III.MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2 34)490-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: 14 a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM __ 490_ <br /> PANEL MANUFACTURER1 � _ ]� ---- 0-9°-7. ; MODEL_#: () ((11 p�(}16 <br /> 490-$ <br /> LEAK SENSOR MANUFACTURER: O 411. ? MODEL#(S): PA o 1 1"06 6 a490-10` <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490.12 MODEL#: 490-13 <br /> ---- - ---------------------------------------- ------------------------------------------------------------------ <br /> IN-TANK PROBE MANUFACTURER: 0-90-14. MODEL#(S): 490-15 <br /> --------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> El d.MONTHLY [Ie.OTHERS ci 490-17 <br /> ------------------------------------------------------------------- --- ---------------------- <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER490-19 <br /> g.p.h. g.p.h. (Specify): a90-19 <br /> 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 420 <br /> El 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: E] a.36 HOURS E] b.60 HOURS 499022 <br /> ❑ 5.TANK INTEGRITY WTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: a.ANNUALLY ❑ b.BIENNIALLY E] c.OTHER(Specify): 499-0--25 <br /> 490-26 <br /> ❑99.OTHER (Specify): 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-2g- <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:4a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> -------------------------------------------- --- - <br /> ----------- ------- <br /> . -_______-- _ -__------ 490.30 1 490-31 <br /> _ PANEL MANUFACTURER�bCj CCC <br /> LEAK SENSOR MANUFACTURER: ( f 490-32 MODEL#(S): L, 0-9°0-3 <br /> -------------------- �ec le -_ - ---------- 1------ - -AGI ---='- --- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. a.YES ❑b.NO 0-90-30- <br /> F LURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 490-35 <br /> MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR X2636) _ 490-36 <br /> 490-37-_-_____-__-___ - <br /> C___ -______ ___-_ 490-38 <br /> MLLD MANUFACTURER(S): M1 MODEL#(S): Q. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> 490-0-0. 490-41 <br /> ELLD MANUFACTURER(S) ! MODEL#(S):----- <br /> ----------------------- ---------------------------------------- --` ----- ---------------------- -------- <br /> PROGRAMMED IN LINE LEAK TEST: ❑ L MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-44 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46490-47 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049 <br /> Allowed for monitoring of unburied emergency generator fuel piping only r HSC§25281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(a)(3)1. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> 490.52 <br /> ❑ 99.OTHER(Specify) ago-53 <br /> UPCF UST-D(12/2007)1/4 <br />