My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:52:42 PM
Creation date
6/3/2020 9:59:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
517
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SwRCB,January 2002 0 Page�of 71 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer X Industry Standard ❑Professional Engineer <br /> Q Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum Q Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Nitrogen with 4"gauge apparatus Equipment Resolution: 0 <br /> Piping Run#DSL piping Run# Piping Run Piping Run# <br /> West <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: AO Smith <br /> Piping Diameter: 4"x 2" " <br /> Length of Piping Run: 150' r <br /> Product Stored: Diesel <br /> Method and location of Test Boot <br /> i in -run isolation: <br /> Wait time between applying ENTFRONMIMNIA <br /> pressure/vacuum/water and 5 Minutes °4 W I1 Q "TUCPjT <br /> starting test: <br /> Test Start Time: 10:05 AM <br /> Initial Reading(Ri): 5.5 psi <br /> Test End Time: 11:05 AM <br /> Final Reading(RF): 5.5 psi <br /> Test Duration: 1 Hour <br /> Change in Reading(RF-Ri): 0 <br /> Pass/Fail Threshold or 0 <br /> Criteria: <br /> Comments—(include information on repairs made prior to testing, and recommended,follow-upr failed tests) <br /> Tested new split repair boot for diesel west product secondary containment after 6 months <br />
The URL can be used to link to this page
Your browser does not support the video tag.