Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: N Check this box if tank gauging is used only for i Hiro <br /> Check this box if no tank gauging or SIR equip: n Y . " <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. U <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for grow s <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? , <br /> a-r <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> El Yes ❑ No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Gom tete the following checklist: <br /> N Yes ❑ No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> ❑ N/A that apply) Simulated leak rate: N 3 g.p.h.; 2 0.1 g.p.h; ❑0.2 g.p.h. <br /> N Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> N Yes ❑ No* Was the testing apparatus properly calibrated? <br /> N Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> N N/A disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> LZN/A fails a test? <br /> ❑ Yes For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N Yes Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: ARM CONTROLLER HAS BEEN INSTALLED ON DIESEL HIGH FLOW AND LLD WITH ARM WAS <br /> CONFIRMED OPERATIONAL. ARM IS SET AT 17 MIN.WITH600 ML BLEED BACK. <br /> Monitoring System Certification Page 3 of 4 12f07 <br /> 3 2/21/07 <br />