Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Nitrogen with 4"gauge apparatus Equipment Resolution: 0 <br /> Piping Run#DSL piping Run# Piping Run Piping Run# <br /> West <br /> Piping Material: Fiberglass <br /> Mom <br /> Piping Manufacturer: AO Smith <br /> Piping Diameter: 3" APR 00 2015 <br /> Length of Piping Run: 150' <br /> Product Stored: Diesel <br /> Method and location of <br /> Test Boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 Minutes <br /> starting test: <br /> Test Start Time: 10:05 AM <br /> Initial Reading(RI): 5 psi <br /> Test End Time: 11:05 AM <br /> Final Reading(RF): 5 psi <br /> Test Duration: 1 Hour <br /> Change in Reading(RF-RI): 0 <br /> Pass/Fail Threshold or 0 <br /> Criteria: <br /> Te <br /> stl2esn)�t .; ;X t'ass Cl ' it 'C Vass C1 Faft -.� Pass p "a l ( Pass ; OF <br /> ai1 <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />