Laserfiche WebLink
SWRCB January 2002 Page of <br /> 6. PEPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑ Other(Spec) Incon <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Incon Sump Tester Incon TS-STS Sump Test System Equipment Resolution: .002 <br /> Sump#DSL West Sump# Sump# Sump# <br /> Sump Diameter: 36" <br /> Sump Depth: 6.5" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 4 <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 5.5' PR 2 0 2035 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dirty <br /> in A­ <br /> Portion of Sump Tested' 1/3 s, W <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X Yes ❑No ❑ NA [-]Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water)?" <br /> Turbine shutdown response time 1 minute <br /> Is system programmed$ for fail-safe X Yes ❑No 11 NA 11 Yes ❑No 11 NA ❑Yes ❑No 11 NA ❑Yes ❑No ❑NA <br /> shutdown? <br /> Was fail-safe verified to be ❑ Yes ❑No X NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 Minutes <br /> test: <br /> Test Start Time: 11:58 AM <br /> Initial Reading(RI): 5.4219 <br /> Test End Time: 12:13 PM <br /> Final Reading(RF): 4.4212 <br /> Test Duration 15 Minutes <br /> Change in Reading(RF-RI): -0.0007 <br /> Pass/Fail Threshold or Criteria: +/-0.002 <br /> Resnt. w % Piss ,` ❑ aid, Cl Passe ,© a�)1 '❑ Pass b FSI CJ <Pa`ss ,❑Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />