My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_1999-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 3:22:58 PM
Creation date
6/3/2020 9:59:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2007
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_1999-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 2. <br /> 9. LL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer FlIndustry Standard F] Professional Engineer <br /> ❑ Other(Sped) <br /> Test Method Used: ❑ Pressure F-1 Vacuum Fx-1 Hydrostatic <br /> 0 Other(Spec i) <br /> Test Equipment Used: Equipment Resolution: <br /> MEN= Spill Box# 1 Spill Box# 2 Spill Box# Spill Box# <br /> Bucket Diameter: 12 12 <br /> Bucket Depth: 10 10 <br /> Wait time between applying <br /> pressure/vacuum/water and 3 0 3 0 <br /> starting test: <br /> Test Start Time: 0830 0830 <br /> Initial Reading(R1 ): 9.5 10 <br /> Test End Time: 0930 0930 <br /> Final Reading(RF ): 9.5 10 <br /> Test Duration: 1 hr 1 hr <br /> Change in Reading(R F-RI ) 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Comments- (include inforrnation on repairs made prior to testing, and recommended follow-up fr)r,failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.