My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_1999-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 3:22:58 PM
Creation date
6/3/2020 9:59:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2007
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_1999-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> e <br /> • Page Z of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: ❑Tank Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ®Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: DIAL GAUGE Equipment Resolution: 0 to 15"Hg Vacuum <br /> Tank 87 Tank Tank Tank <br /> Is Tank Exempt From Testing?' ❑ es ❑No ❑ s ❑No ❑Yes [I No ❑Yes ❑No <br /> Tank Capacity: ® GALLONS fJ° GALLONS GALLONS GALLONS <br /> Tank Material: F&-44r3 tee--_ <br /> Tank Manufacturer: c, <br /> Product Stored: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: 7"3 C-) <br /> Initial Reading(RJ: /Q "HG JAI "HG "HG "HG <br /> Test End Time: S ° ® VS <br /> Final Reading(RF): /®"HG "HG "HG "HG <br /> Test Duration: / <br /> Change in Reading(RF-RD: HG "HG "HG "HG <br /> Pass/Fail Threshold or Criteria: Zero Zero Zero Zero <br /> Was sensor removed for testing? ®Yes ❑No ❑NA ®Yes ❑No ❑NA ®Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and ®Yes ❑No ❑NA ®Yes ❑No ❑NA ®Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> Chevron #208118 <br /> 3355 E. Hammer Ln. <br /> Stockton, CA. 95212 <br /> N04765 — SB 989 Testing <br /> 1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23,Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.