Laserfiche WebLink
Page 44of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑Pressure ❑ Vacuum ®Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Wayne Perry Inc. Equipment Resolution: .0007" <br /> Sump# .C5-7 Sump# Cj ( Sump# Sump# <br /> Sump Diameter: f �° <br /> Sump Depth: <br /> Sump Material: Ycrx e6 �: go- <br /> Height <br /> rHeight from Tank Top to Top of » » <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest (,�✓ »�� s` » <br /> Electrical Penetration: O <br /> Condition of sump prior to testing: e,cV_a - <br /> Portion of Sum Tested' 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST <br /> Sump PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> product and water)?` <br /> Turbine shutdown response time NA NA NA <br /> Is system programmed for fail-safe ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> shutdown?` <br /> Was fail-safe verified to be ❑Yes ❑No ®NA ❑Yes []No ®NA ❑Yes []No ®NA ❑Yes ❑No ®NA <br /> opera ional?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> test: <br /> Test Start Time: ;d <br /> Initial Reading(RO: 0 <br /> Test End Time: <br /> Final Reading(RF): �•$QS j <br /> Test Duration: 15 Min 15 Min X15 Min 15 Min 15 Min 15 Min 15 Min 15 Min <br /> Change in Reading(RF-Ri): �D / I/e600 <br /> Pass/Fail Threshold or Criteria: -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> gi <br /> Test : � ss1 <br /> x - <br /> 1.11 <br /> Was sensor removed for testing? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> Chevron #208118 <br /> 3355 E. Hammer Ln. <br /> Stockton, CA. 95212 <br /> N04765 — SB 989 Testing <br />