My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_1999-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 3:22:58 PM
Creation date
6/3/2020 9:59:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2007
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_1999-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Tank cross-sectional diagram included on blueprints. <br /> 5. Detail of tank, piping system, excavation and cover. <br /> Q 6. Tank(s) and,piping approved by a nationally recognized independent testing <br /> organization. [Title 23, Subchapter 16, Article 3, Sec. 2631 (r) & 2635] <br /> Urn- <br /> 7. _ Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br /> 8. Manufacturer's written installation instructions for tank(s), piping, monitoring <br /> devices, etc. [Section 2635 (b) (5)] <br /> 9. Tightness Test (NFPA 30) is required on both primary (1°) and secondary <br /> (20) containment systems before covering. [Section 2635 (b) (6) & (7)] <br /> 10. Double walled tanks using pressure or vacuum testing to monitor the annular <br /> space. [Section 2635 (b) (7)] <br /> 11. NFPA 329 "Precision Test" required upon completion of installation with tank <br /> in operating condition. Test results to be submitted directly to PHS/EHD <br /> from the testing company or owner of facility. [Health & Safety Code, <br /> Division 20, Chapter 6.7, Section 25291 (g)] <br /> 12. TANK COMPOSITION <br /> TANK # #/ # Z #-S # # <br /> CAPACITY /c e7CF0 /O,6 -b <br /> MANUFACTURER <br /> COMPOSITION uU �F,C-4 . b.0. FG P j, T <br /> M6DEL <br /> CT S; U. L o,L_ e <br /> CORROSION <br /> PROTECTION �✓� <br /> COMPATIBILITY <br /> WITH 100% <br /> METHANOL <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.