Laserfiche WebLink
0 1 ZE WARNING: <br /> In a non-traffic installation,insure that the areas above the If the soil is extremely soft or inherently unstable,(e.g.peat, <br /> tanks will never be subject to traffic or other type loads. quicksand,muck,landfill,very soft or highly expansive clay, <br /> NOTE:These depths of cover are MINIMUMS in all cases. etc.)Xerxes recommends that the tank owner seek the advice <br /> NOTE:Asphalt and concrete pads must extend a minimum of 12 inches beyond of a local foundation professional engineer. <br /> tank in all directions. <br /> NOTE:Maximum burial depth is 7 feet of cover over top of tanks. <br /> FILTER FABRIC <br /> NOTE:Unattached manway riser(if present)must not transmit load from the The tank owner or his technical representative is responsible for <br /> concrete slab to the tank.There must be a minimum of 6 inch space between the determining whether filter fabric or an alternate filtering technique <br /> bottom of the riser and the top of the tank, is appropriate for a specific installation. Filter fabric allows the <br /> NOTE:Tanks of 10 foot diameter and 30,000 gallons and larger may require a passage of water but prevents the migration and mixing of native <br /> deeper burial or thicker top slab to offset buoyancy.Contact Xerxes'Technical soil and the select backfill material. It helps preserve the integrity of <br /> Service Department for further information. the select backfill envelope which surrounds and supports the tank. <br /> Xerxes recommends that filter fabric be used when the tank may <br /> TANK SPACING be installed in: <br /> A <br /> NOTE:These are minimum spacings and must be increased as needed to . areas with frequently changing ground water conditions or <br /> accommodate deadmen or anchor slabs.Refer to Section 7 on tank anchoring. areas subject to tidal fluctuations, <br /> Always allow sufficient clearance to allow the deadmen to be set outside of the • unstable soils such as cited above, <br /> tank shadow. ^ water conditions with silty soil. <br /> TOP VIEW For further information concerning fabric specifications and <br /> installation procedures,consult the filter fabric supplier's <br /> installation guide or instructions. <br /> To install filter fabric,typically filter fabric manufacturers <br /> e recommend that the installer line the excavation sides and bottom <br /> with the fabric.Overlap adjoining panels by at least 12 inches. <br /> Place backfill material on the panels around the edge of the hole <br /> to anchor them in place. <br /> $TAB`S Boi11 <br /> l In wet-hole conditions,use backfill material to sink and hold the <br /> FIGURE 4-5 fabric in place on the hole bottom. <br /> NOTE:Polyethylene film is not considered an effective material to prevent <br /> STABLE SOIL CONDITIONS migration of pea gravel,crushed stone and native soil;it may tear or degrade <br /> Where shoring is not required to maintain a vertical wall from top while in service. <br /> to bottom of the excavation,and the soil is stable,the minimum <br /> spacing between the sidewall or endcap of the tank and side of ®® • • <br /> excavation must be 18 inches[24 inches for 12 foot tanks]. If CAUTION: <br /> more than one tank is to be installed in the same hole,there must <br /> be at least 18 inches between the tanks. Xerxes recommends that every site be thoroughly evaluated <br /> for the potential to trap water or otherwise subject the tank to a <br /> TOP VIEW rise in the local water table.Xerxes recommends that all tanks <br /> be anchored in installations in which water may enter the hole. <br /> Failure to anchor the tank in a wet hole may damage the tank <br /> 112 <br /> or surrounding property. <br /> =111101111IM11111MIN <br /> Prepare a smooth level bed, 12 inches thick,of approved backfill <br /> material. Place the tank or tanks onto the bed. Do not set Xerxes <br /> tanks directly onto a concrete slab or on timbers,cradles or <br /> directly onto the hole bottom. <br /> 11140111 <br /> Leveling: As the tank is being placed,set the tank pitch as shown <br /> FIGURE 4-6 on the site plans.Xerxes does not require that a tank be pitched. <br /> All pitch is determined by the tank owners specification. If a <br /> double wall tank is pitched,the monitor should be at the low end. <br /> UNSTABLE SOIL CONDITIONS Use the tops of the ribs to establish longitudinal level. Establish <br /> If the soil has less than 750 lbs./sq.ft.cohesion as calculated lateral level by placing the level across the top of a fitting,a <br /> from an unconfined compression test;or in soils having an manway or a collar. <br /> ultimate bearing capacity of less than 3500 lbs./sq.ft.;or where When the tank is placed,take the first diameter reading <br /> soil will not maintain a vertical wall,the excavation must allow a (Deflection reading"A"on the checklist).See Section 13 for <br /> minimum space equal to 1/2 the diameter of the tank between the instructions on taking deflection readings. <br /> side and endcap of the tank and the excavation wall to enhance If the tank is to be anchored,install the anchoring hardware at <br /> lateral soil resistance.The spacing between adjacent tanks, 18 this time(See Section 7). <br /> inches,remains the same.A reinforced concrete slab may be <br /> required under the tank for the foundation in the pit bottom. <br />