My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_1999-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 3:22:58 PM
Creation date
6/3/2020 9:59:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2007
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_1999-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILLING 0CAUTION: <br /> Use only approved backfill material(See Section 3).Do not mix Never allow an empty tank to remain in a wet hole,or a dry hole <br /> approved material with sand or native soil. Do not use native soil that may become wet,unless anchoring and backfilling have <br /> as backfill material.All excavated native soil must be replaced been completed.Failure to anchor and backfill may damage <br /> with approved material. Place one 12 inch lift of material evenly the tank or surrounding property. <br /> around the tank. From the hole side or the top of an adjacent NOTE:Deflection readings to be taken in sequence similar to steps described in <br /> tank,work the material by hand completely beneath the tank Section 5. <br /> body and domes to provide full support. Use a nonmetal probe Pump the water from the hole to maintain minimum water level. <br /> bar long enough to reach beneath the tank and push the backfill Add a minimum of 12 inches of well-placed backfill material to the <br /> in place.Repeat this step with a second 12 inch lift.After the hole,and level the bed to assure uniform bottom support for the <br /> second lift of material has been placed and probed,the backfill pp <br /> tank. Position the tank in the hole. <br /> can be brought to the top of the tank without further hand work. <br /> UTI Partially ballast tank until it settles firmly on the prepared bed. <br /> 0f Ballast level in a tank must never exceed water level in hole <br /> Do not strike the tank with the probe bar. The tank may be during installation.Use only enough ballast to sink the tank until <br /> damaged and require repair. backfill material is even with the top of the tank. <br /> 11�=11111 11=�Ilillll <br /> RIGHT IIIII=_ WRONG IIIII- 0WARNING: <br /> III-IIIII III-IIIII If product is used as ballast,exercise special care in handling. <br /> ' IIIII- IIIII= Safeguard against sparks,fire or product spills.Improper <br /> IIII=IIIII IIII-IIIII handling of product can cause a fire or explosion,and death, <br /> severe personal injury or property damage. <br /> II-IIIII-IIIII-IIIII-IIIII III-IIIII-IIIII-IIIII-IIIII After leveling tanks,the anchoring procedures in Section 7 must <br /> FIGURE 5-1 FIGURE 5-2 be followed. <br /> When the tank is backfilled to the tank top: Backfill must be added evenly after anchoring,and remaining dry <br /> •take an intermediate diameter reading as an in-process hole backfilling procedures should be followed as stated in <br /> check. Section 5. <br /> • repeat the 5 PSIG(3 PSIG for 12 foot tanks)air test as NOTE:Cover depth must meet minimum depth specified in Section 4 of these <br /> outlined in Section 2,soaping all exposed areas of the tank installation instructions. <br /> and all fittings. NOTE:It is recommended that the tank be completely ballasted once backfill is <br /> even with the top of the tank. <br /> SUMMARY <br /> 1. Prepare the tank bed. <br /> 2.Set and level the tanks. <br /> I <br /> 3.Measure the tank diameter. _ <br /> 4. Install holddown hardware(if applicable). <br /> 5.Place and probe the first two lifts of backfill material. <br /> 6.Add backfill to the top of the tank. 2 <br /> 7.Measure the tank diameter and repeat the air test. FIGURE 11 <br /> After the air test and measurement of tank deflection are <br /> 6-1 <br /> successfully completed,it is recommended that the tank be <br /> ballasted until piping installation and final backfilling to grade is <br /> completed.When filling the tank, make sure that the tank isCA <br /> UTI <br /> adequately vented.The vent must be large enough to allow the ba Xerxes recommends that eve site be thoroughly evaluated <br /> displaced air escape. for the potential to trap water or otherwise subject the tnk to a <br /> NOTE:Do not ballast the tank until the backfill is even with the top of the tank. rise in the local water table.Xerxes recommends that all tanks <br /> WARNING: be anchored in installations in which water may enter the hole. <br /> If product is used as ballast,exercise special care in handling. Failure to anchor may damage the tank or surrounding <br /> Safeguard against sparks,fire or product spills.Improper property. <br /> handling of product can cause a fire or explosion,and death, DEADMAN ANCHOR <br /> severe personal injury or property damage. <br /> A deadman is a reinforced concrete beam.The length of the <br /> deadman is equal to the length of the tank. A deadman may be <br /> ® ® fabricated in multiple sections as long as the total length is not <br /> WARNING: decreased and each section contains at least two anchor points. <br /> The width and thickness depend on the tank diameter. Refer to <br /> Do not use air pressure to test tanks that contain flammable or Table 7-1 for specific dimensions. <br /> combustible liquids,or vapors,and do not perform any post NOTE:Tanks of 10 foot diameter and 30,000 gallons or larger may require <br /> installation pressure tests.The fuel and air mixture may explode larger deadman to offset buoyancy.Contact Xerxes'Technical Service <br /> and cause death,severe personal injury,or property damage. Department for further information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.