My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_1999-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 3:22:58 PM
Creation date
6/3/2020 9:59:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2007
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_1999-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HARDWARE AND ANCHORING POINTS <br /> Anchoring hardware and anchor points must be sized according <br /> to Table 7-3 and manufactured to industry standards and 0 WARNING: <br /> 191 dimensions.The installing contractor is responsible for providing Do not use air pressure to test tanks that contain flammable or <br /> hardware and anchor points of sufficient strength.The particular combustible liquids or vapors,and do not perform any post- <br /> configuration of hardware will be determined by the owner or the installation pressure test. The fuel/air mixture may explode and <br /> owner's representative. Locate the anchor points as shown in cause death,severe personal injury or property damage.Tanks <br /> Table 7-2 and Figure 7-2. Refer to dimension"E".Align all anchor that will be ballasted with a flammable product should be air <br /> points with the marked(><)location on the tanks,within a tested before ballasting, <br /> tolerance of± 1 inch. For specific information on hardware and its �jWARNING: <br /> use,consult the hardware manufacturer. <br /> 0 TI If product is used as ballast,exercise special care in handling. <br /> Safeguard against sparks,fire or product spills.Improper <br /> Use only appropriate sized hardware with the strap eye. handling of product can cause a fire or explosion,and may <br /> Oversized hardware may damage the strap eye and result in result in death,severe personal injury or property damage. <br /> personal injury or property damage.See Figure 7-4 for strap <br /> eye dimensions. INTERMEDIATE DEFLECTION MEASUREMENT <br /> After backfill is brought to the top of the tank,make an <br /> MINIMUM TURNBUCKLE DIAMETER MINIMUM intermediate measurement of vertical deflection according to the <br /> TANK (BYTYPE) WIRE ROPE instructions in Section 13. <br /> DIAMETER HOOK JAW EYE DIAMETER <br /> TEST <br /> 4' 3/4" 1/2" 1/2" 3/8" After the tank has been measured and vertical deflection is <br /> 6' 3/4" 1/2" 1/2" 3/8" determined to be within the limits specified by Xerxes,the tank <br /> 8' 11/4" 3/4" 3/4" 1/2" must be pressure tested to ensure that no damage occurred <br /> during installation.The procedure in Section 2 Pre-installation <br /> 10' 11/4" 3/4" 3/4" 1/2" Testing should be followed,soaping all exposed areas of the tank <br /> 12' 11/4" 3/4" 3/4" 1/2" and all fittings. <br /> Because most of the tank exterior is no longer visible,the tank <br /> TABLE 7-3 must be tested by checking the gauge for one hour at the test <br /> manifold for any drop in pressure.Carefully relieve the pressure <br /> in the tank and remove the Quick Disconnect assembly from dry <br /> 31/4" Double Wall tanks. <br /> T:: -rte 0 WARNING: <br /> _f Do not use air pressure to test tanks that contain flammable or <br /> combustible liquids or vapors and do not perform any post- <br /> installation pressure test.The fuel/air mixture may explode and <br /> cause death,severe personal injury,or property damage. <br /> FIGURE 7-4 Tanks that will be ballasted with a flammable product should <br /> be air tested before ballasting. <br /> NOTE:Drop-forged type turnbuckle may be used in place of all or a portion of Zt, WARNING: <br /> wire rope. <br /> NOTE:All exposed metal on the holddown straps,turnbuckles and/or threaded If product is used as ballast,exercise special care in handling. <br /> rod must be coated or galvanized to prevent corrosion(Figure 7-4A). Safeguard against sparks,fire or product spills.Improper <br /> NOTE:When fastening wire rope,use a minimum of three clamps on each joint. handling of product can cause a fire or explosion,and mayresult in death,severe personal injury or property damage. <br /> Use shackle-type or chair-type clamps as appropriate(Figure 7-4A). <br /> The tank may be ballasted after the backfill is even with the top of <br /> the tank and post-installation testing,if applicable,has been <br /> successfully completed.Only under wet-hole conditions,as <br /> described in Section 6,should ballast be added before the backfill <br /> is even with the top of the tank.When filling the tank,make sure <br /> FIGURE 7-4A the tank is properly vented.The vent must be large enough to <br /> allow the displaced air to escape. <br /> o.•e• <br /> IINI= =11111-11111=11111- <br /> 11111=11111-11111-11111-11111-11111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.