My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_1999-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 3:22:58 PM
Creation date
6/3/2020 9:59:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2007
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_1999-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16. Any special accessories, fittings, coatings, or linings not inherent within the <br /> initial design of the 1° tank or double-wall UST. [Section 2631 (r)] <br /> A. Approved by a nationally recognized independent testing <br /> organization. <br /> B. Demonstration of integrity with the 1° container or double <br /> walled UST. <br /> 17. Tanks subject to floatation. [Section 2631 (s)] Ufa5 <br /> S (Dc n <br /> A. Anchored by deadman or slab. PO- <br /> B. Anchors to be installed as specified by manufacturer. <br /> C. Installation details provided on plans. <br /> 18. Fiber liners between tank(s) and excavation to prevent infiltration of native <br /> soil into backfill material. <br /> 19. Secondary container other than double-walled tanks(includes interception and <br /> detection systems). [Section 2633 (f)] <br /> A. Backfill in secondary container. [Section 2635 (c) 1-8] <br /> B. Pore space of granular material used as backfill for primary <br /> container(s) complies with Section 2631 (g). [Engineering data <br /> to support capacity requirement]. <br /> C. Two or more primary containers within secondary container. <br /> (include information on product compatibility) <br /> D. Secondary container capable of precluding highest anticipated <br /> groundwater. <br /> E. Secondary container sloped to a monitoring sump from which <br /> leakage or precipitation can be detected and removed. <br /> F. Water tight corner which extends at least a foot beyond each <br /> boundary of the secondary container excavation,sloped to drain <br /> away from excavation. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.