Laserfiche WebLink
10/05/1999 09:12 2033651543 TANKNOLOGY PAGE 04 <br /> INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> i a <br /> TEST DATE:10/04/99 agoo SHOAL CREEK,BUILDING 200 WORK ORDER NUMBER2210251 <br /> CLiENTYMNEPT CONSTRUCTION AUSTIN,TEXAS 78757(512)451-6334 SITE:CHn%OIJ STATION 0209116 <br /> INFOR &TION' r <br /> Tank ID: 92 2 Tank manitolded: NO Bottom to top fill in inches: 159.5 <br /> Product: SUPREM Vent manitolded: No Bottom to grade in inches: 197.0 <br /> Capacity in gallons: 14,976 Vapor recovery manitolded: Yza Fill pipe length in inches: 72.5 <br /> Diameter in inches: 217.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 325 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: Dw FiB rRc Installed: ATO Stage 11 vapor recovery: xasssT <br /> CP installed on: / ! <br /> COMMENTS <br /> Nk: t 'UL:Y-9 Test Method:vacuT®ot' LEAK DETECTOR TEST R t!L'TS Tesf-'rh X' <br /> -Start;in) End(in) <br /> Dipped Water Level: 0.00 0.00 Newlpassed Failedheplseed Newtpassed Fall"molaeed <br /> Dipped Product Level: <br /> 76.00 76.00 40.01 L.D.01 1-0.02 L O.12 <br /> Probe Water Level: 0.000 -0.003 Make: vssDERRo®T <br /> Ingress Detected: Waver N Nubble N UllageN Model: P.L.D. <br /> Tagil lime: 11:53-13:5 3 S/N; <br /> Inclinometer re wing: 0.00 Open time in sec: <br /> VacuTect Test Type: multiple tasks Holding psi: NOT <br /> VacuTeot Probe Entry Poinl: Fill Resiliency cc: <br /> Test leak rate mVm: 169.0 TsaTaD <br /> Pressure Ser Point: -0.50 <br /> Tank water level in inches; 0.o o Metering psi: l0 <br /> Calib.leak in <br /> Water table depth in inches: 200.00 g Results: <br /> S,00 <br /> : PAas <br /> Determined by(method): BVRVEY <br /> Result: BASS <br /> COMMENTS <br /> COMMENTS <br /> ` .. EST RESULT-1r.-I.: <br /> ,: <br /> TesrW = <br /> IINF......_ A 6 C D <br /> IV ale,It:. DW FZBERG <br /> Diameter(in) 2.0 <br /> Length(A) 200.0 <br /> TeS(pS,' S0 <br /> Bleedback ce 125 <br /> Test tirnu(min) 30 NOT NOT NOT <br /> Start time. 12:45 TESTED TZOTZD TT.STaD <br /> Fr,d time: 13:15 <br /> I,final gp1) 0.017 <br /> Result: Pass <br /> Pump type: PRZSSURE <br /> Pump makes FE Ps"TRO <br /> COMMENTS Impact Valves Operational: YZ® <br /> Drat!1010-541999 09:06 MS HAW <br />