Laserfiche WebLink
VGROUPINc. <br /> ARCHITECTURE • ENGINEERING • ENVIRONMENTAL SERVICES <br /> 1137 North McDowell Blvd., Petaluma, CA 94954-1110 Telephone: (707) 765-1660 Facsimile:(707) 765-9908 <br /> JOHN W. JOHNSON Esta b u s h e d 1 9 6 6 <br /> Architect February 2, 1999 <br /> Co-President <br /> BRIAN F. Z I T A Ms,Mosey L.Foley `-- -� .� <br /> £ <br /> Architect San Joaquin Co. Environmental Health Division ' <br /> C o-President 304 East Weber Ave. (Third Floor) <br /> Stockton, CA. 95202 FEB 4 +9� <br /> JOHN B. HICKS RE: Chevron/McDonalds <br /> Architect 3355 East Hammer Lane <br /> Vice President Stockton, Calif. <br /> Dear Ms.Foley: <br /> CECIL R. SPENCER our Response to plan check correction letter dated February. 01, 1999: <br /> Architect P Y <br /> Vice President <br /> 1. It is my understanding that Chevron needs to select a certified contractor prior to <br /> Being issued a building permit. Chevron has selected Wendt Construction Co.to <br /> install the under ground fuel tank and piping systems. <br /> ALAN SHIMABUKURO <br /> Regional Manager <br /> Associate At this point we are not asking for any permit to construct.We are only submitting <br /> the required plans, specs,documents and applications and resolving any issues with <br /> these so that the Chevron Project Engineer/Manager and his contractor can obtain <br /> their permits when construction is scheduled. <br /> CHRIS LAWTON <br /> Regional Manager 2 Wendt Construction Co. will provide all necessary licenses and <br /> Associate <br /> certifications prior to obtaining a permit to construct. <br /> 3. The Chevron Project Engineer)Manager will submit a monitoring and response <br /> JAMES E. P R E S T E N Plan prior to obtaining a permit to operate. <br /> Regional Manager <br /> Associate 4. The three flex hose manufacturers listed in our plan's bill of materials are"Teleflex, <br /> Hosemaster and Titeflex". All their products are UL approved and certified. The <br /> UL certification and number for each specific product is secured to each product <br /> GARY M. S E M L I N c and can be obtained from the products when delivered to the site. <br /> Managing Architect <br /> Associate These flexible hoses connect the fixed piping to the turbine pumps and the fixed <br /> piping to the product dispensers. <br /> B L Y T H E R. WILSON 5. Yes,via the TLS 350 UST monitoring system. <br /> Managing Architect <br /> Associate 6. Cut sheet for the OPW spill bucket is enclosed. <br /> C:Nly \Sto&US72.dm <br /> BELLEVUE, WA LA HABRA, CA SACRAMENTO, CA SCOTTSDALE. AZ <br />