My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_1999-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 3:22:58 PM
Creation date
6/3/2020 9:59:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2007
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_1999-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VGROUPINc. <br /> ARCHITECTURE • ENGINEERING • ENVIRONMENTAL SERVICES <br /> 1137 North McDowell Blvd., Petaluma, CA 94954-1110 Telephone: (707) 765-1660 Facsimile:(707) 765-9908 <br /> JOHN W. JOHNSON Esta b u s h e d 1 9 6 6 <br /> Architect February 2, 1999 <br /> Co-President <br /> BRIAN F. Z I T A Ms,Mosey L.Foley `-- -� .� <br /> £ <br /> Architect San Joaquin Co. Environmental Health Division ' <br /> C o-President 304 East Weber Ave. (Third Floor) <br /> Stockton, CA. 95202 FEB 4 +9� <br /> JOHN B. HICKS RE: Chevron/McDonalds <br /> Architect 3355 East Hammer Lane <br /> Vice President Stockton, Calif. <br /> Dear Ms.Foley: <br /> CECIL R. SPENCER our Response to plan check correction letter dated February. 01, 1999: <br /> Architect P Y <br /> Vice President <br /> 1. It is my understanding that Chevron needs to select a certified contractor prior to <br /> Being issued a building permit. Chevron has selected Wendt Construction Co.to <br /> install the under ground fuel tank and piping systems. <br /> ALAN SHIMABUKURO <br /> Regional Manager <br /> Associate At this point we are not asking for any permit to construct.We are only submitting <br /> the required plans, specs,documents and applications and resolving any issues with <br /> these so that the Chevron Project Engineer/Manager and his contractor can obtain <br /> their permits when construction is scheduled. <br /> CHRIS LAWTON <br /> Regional Manager 2 Wendt Construction Co. will provide all necessary licenses and <br /> Associate <br /> certifications prior to obtaining a permit to construct. <br /> 3. The Chevron Project Engineer)Manager will submit a monitoring and response <br /> JAMES E. P R E S T E N Plan prior to obtaining a permit to operate. <br /> Regional Manager <br /> Associate 4. The three flex hose manufacturers listed in our plan's bill of materials are"Teleflex, <br /> Hosemaster and Titeflex". All their products are UL approved and certified. The <br /> UL certification and number for each specific product is secured to each product <br /> GARY M. S E M L I N c and can be obtained from the products when delivered to the site. <br /> Managing Architect <br /> Associate These flexible hoses connect the fixed piping to the turbine pumps and the fixed <br /> piping to the product dispensers. <br /> B L Y T H E R. WILSON 5. Yes,via the TLS 350 UST monitoring system. <br /> Managing Architect <br /> Associate 6. Cut sheet for the OPW spill bucket is enclosed. <br /> C:Nly \Sto&US72.dm <br /> BELLEVUE, WA LA HABRA, CA SACRAMENTO, CA SCOTTSDALE. AZ <br />
The URL can be used to link to this page
Your browser does not support the video tag.