My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_1999-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 3:22:58 PM
Creation date
6/3/2020 9:59:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2007
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_1999-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R <br /> UST SYSTEM DRAWING INFORMATION <br /> 1. v Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be instatted). <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. c..i Plot plan to show location of tanks and all associated piping. <br /> 4. �^'' Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. �" Tank cross-sectional diagram. <br /> 6. Detail of tank, associated piping, excavation and cover. <br /> 7. _� Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> Article 3, Section 2631 (b) & 26353 <br /> g. Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. V Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. 4.1" At the installation site, prior to installation, a tightness test shalt be performed on both primary (1®) and <br /> secondary (2°) containment systems before covering. [Section 2635 (a) (3) & (4)3 <br /> Ti. ✓ Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PNS-EHD from the testing company or owner of facility. Oieatth & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)3 <br /> 12. TANK COWMITION <br /> TANK # 9 i * �J 9 A <br /> CAPACITY A® { G. <br /> MANUFACTURER N. E X <br /> COMPOSITION ®W <br /> MODEL <br /> A � <br /> PRODUCT Mr. ONL G E t1N <br /> CORROSION PROTECTION R <br /> U.L. LISTED S E <br /> COMPATIBILITY WITH 100% <br /> METHANOL S E S <br /> 13. TANK(s) TO BE INSTALLEO <br /> _ A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverinngs. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> _ (3) Hydrostatic annular (primary tares pressure test). <br /> C. Non-clad steel tank [Section 2635 (a) (2) (A)3 <br /> (1) Cathodic protection provided for entire tank, piping and components (chats, bolts, washers, <br /> etc.). <br /> (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.