Laserfiche WebLink
4 <br /> Page // of- <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ®Industry Standard ❑ProfessionaI Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Wayne Perry Inc. Equipment Resolution:.0007" <br /> Sump# Sump# Sump# Sump# <br /> Sump Diameter: iV11 �� > <br /> Sump Depth: .7711 ' <br /> Sump Material: e <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> i <br /> Height from Tank Top to Lowest » » <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sum Tested' 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST <br /> Sump PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION <br /> i <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑NO ®NA ❑Yes ❑No ®NA <br /> product and water)?* <br /> Turbine shutdown response time NA NA NA f <br /> Is system programmed for fail-safe ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> shutdown?* , <br /> Was fail-safe verified to be ❑y� ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes El No ®NA <br /> -operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 Minutes 15 Minutes 15 Minutes 15 Minutes. <br /> test: <br /> Test Start Time: <br /> Initial Reading(R): /.10323 <br /> Test End Time: <br /> Final Reading(RF): Al, <br /> Test Duration: 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min <br /> Change in Reading(RF-Ri): �V'FV61 ,,Opel' <br /> Pass/Fail Threshold or Criteria: -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> Tesltsl>1�> „_ Pass:: ❑]F'gil 9 Vass I ❑ Pass _.Gail` Q:Pss3Fail_ <br /> Was sensor removed for testing? Yes ❑No ❑NA 19 Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and yes ❑No ❑NA )4 Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> I <br /> I <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> i <br /> i <br /> Chevron#208118 <br /> 3355 E Hammer Ln <br /> Stockton, Ca <br /> #07350 SB989 <br />