My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_1999-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 3:22:58 PM
Creation date
6/3/2020 9:59:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2007
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_1999-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Page // of- <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ®Industry Standard ❑ProfessionaI Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Wayne Perry Inc. Equipment Resolution:.0007" <br /> Sump# Sump# Sump# Sump# <br /> Sump Diameter: iV11 �� > <br /> Sump Depth: .7711 ' <br /> Sump Material: e <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> i <br /> Height from Tank Top to Lowest » » <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sum Tested' 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST <br /> Sump PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION <br /> i <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑NO ®NA ❑Yes ❑No ®NA <br /> product and water)?* <br /> Turbine shutdown response time NA NA NA f <br /> Is system programmed for fail-safe ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> shutdown?* , <br /> Was fail-safe verified to be ❑y� ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes El No ®NA <br /> -operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 Minutes 15 Minutes 15 Minutes 15 Minutes. <br /> test: <br /> Test Start Time: <br /> Initial Reading(R): /.10323 <br /> Test End Time: <br /> Final Reading(RF): Al, <br /> Test Duration: 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min <br /> Change in Reading(RF-Ri): �V'FV61 ,,Opel' <br /> Pass/Fail Threshold or Criteria: -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> Tesltsl>1�> „_ Pass:: ❑]F'gil 9 Vass I ❑ Pass _.Gail` Q:Pss3Fail_ <br /> Was sensor removed for testing? Yes ❑No ❑NA 19 Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and yes ❑No ❑NA )4 Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> I <br /> I <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> i <br /> i <br /> Chevron#208118 <br /> 3355 E Hammer Ln <br /> Stockton, Ca <br /> #07350 SB989 <br />
The URL can be used to link to this page
Your browser does not support the video tag.