Laserfiche WebLink
i <br /> Page 7 of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer M Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum M Hydrostatic <br /> i <br /> ❑Other(Specify) <br /> Test Equipment Used:Wayne Perry Inc. See Attached Results Equipment Resolution:.0007 <br /> Spill/Overfill Containment Box Number <br /> Bucket Diameter: /2- /Z" 17 " 12- <br /> Bucket <br /> 2- <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: 7-3 <br /> Initial Reading(Rj): ), 21 f Al g3 79rZ 0-12 91 L,-20 <br /> Test End Time: .°/ 11- 37 9/ <br /> Final Reading(RF): J9� x o <br /> i <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or -0.0020 -0.0020 -0.0020 1---0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> Criteria: -WIM _ <br /> s — — <br /> I <br /> CoM Ments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> II <br /> i <br /> I <br /> i <br /> i <br /> I <br /> Chevron#208118 <br /> 3355 E Hammer Ln <br /> Stockton, Ca <br /> #07350 SB989 <br />