Laserfiche WebLink
SWRCB,January 2002 AOL Page 2 <br /> �. S LL/OVERFILL CONTAINMENT IXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: El <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer a Industry Standard El Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: F] Pressure ❑ Vacuum X❑ Hydrostatic <br /> El Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 1 SUP FILL Spin Box# 2 UNL FILL Spill Box# Spill Box# <br /> Bucket Diameter: 12 12 <br /> Bucket Depth: 10 10 <br /> Wait time between applying <br /> pressure/vacuum/water and 1MIN 1MIN <br /> starting test: <br /> Test Start Time: 1130 1130 <br /> Initial Reading(Ri ): 9 9 <br /> Test End Time: 1230 1230 <br /> Final Reading(RF ): 9 9 <br /> Test Duration: 1HR 1HR <br /> Change in Reading(R F-RI ) 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />