My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 4:50:21 PM
Creation date
6/3/2020 9:59:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_2008-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order: 2256177 0 <br /> (1;1%0)&fl'sv)Temnl;J-i:r.qi-"Ic'sion 1:!.w7 <br /> E mergency Shut off(ESO) & <br /> Dispenser Emergency Shutoff Valve (ESV) <br /> A N N UA 1,TEST RECORD LOCATIONS ANUITEST DATA <br /> ic <br /> Date: 41 <br /> �ncaJlan Na <br /> Inc: <br /> Store#., Slate 1D If. <br /> City: <br /> Cole <br /> Emer genev Shut Off(ESO) Tesfine Results <br /> Oil (e in accordance with"ESO Vendor Letter(3)-21-05).doe",from <br /> Colliplianc Department,as a part of annual compliance testing,this representative tested the <br /> Emergency Shut Off(ESO)switches indicated on this sketch Findings listed below. <br /> '3nMM1%y'3h1jL Off(C-SC)) No,Provide <br /> Operational'? y l�i Maintenance Log <br /> Date Called- <br /> DisPenser Emergenc V Shutoff Valve (ESV) Testing jesultS <br /> On n accordance wi th NFPA 30A this representative tested the aRt0M.tt'C-CjoS j 11_ ftatij r-C <br /> of the D"sl1enscr FIJI'el-geticY S 11 vtoff VALVE(S)(ESV) lacated in the supply lines at the base o 1,micl I <br /> individtiai island 1v <br /> pe dispenser indicated on the diagram be[ow-Each dcvice <br /> WOUld UltOnladeafty close. Findings listed below: <br /> Dixp.Line LVACY S11111()if <br /> UNn,Provide <br /> — <br /> Valve(R-Sv".Operatiollul? <br /> I gr <br /> Y/NTM Date Cilled: <br /> ,7s L_r <br /> V 0 <br /> fttvf <br /> TV%k <br /> --------------------------- <br /> Y� lr-r P. <br /> .2 <br /> SiRZ12tUre Of Rprip-peontnt;.. <br /> Tanknology Inc. 8501 N.MoPac Expressway,Suite 400,Austin,Texas 78759 <br />
The URL can be used to link to this page
Your browser does not support the video tag.