My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 4:50:21 PM
Creation date
6/3/2020 9:59:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_2008-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> Mo P Ta n,k <br /> TEST DATE: 03/02/10 8501 N MOPAC EXPRESSWAY,SUITE 400 WORK ORDER NUMBER: 2272643 <br /> AUSTIN,TEXAS 78759(512)451-6334 <br /> CLIENT: CHEVRON PRODUCTS SITE: CHEVRON 208118 <br /> Tank ID: 1 1 Tank manifolded: No Bottom to top fill in inches: 117.0 <br /> Product: SUPREME Vent manifolded: YES Bottom to grade in inches: <br /> Capacity in gallons: 14,976 Vapor recovery manifolded: YES Fill pipe length in inches: <br /> Diameter in inches: 117.00 Overfill protection: YES Fill pipe diameter in inches: <br /> Length in inches: 325 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DW FIBERG Installed: ATG Stage II vapor recovery: ASSIST <br /> CP installed on: <br /> COMMENTS <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: VEEDERROOT <br /> Fluid volume in gallons: Model: ELECTRONIC <br /> Tank water level in inches: S/N: 005877 <br /> Test time: NOT Open time in sec: <br /> Number of thermisters: TESTED Holding psi: 32 NOT <br /> Specific gravity: Resiliency cc: TESTED <br /> Water table depth in inches: Test leak rate ml/m: 189.0 <br /> Determined by(method): Metering psi: <br /> Leak rate in gph: Calib.leak in gph: 3.00 <br /> Result: Results: PASS <br /> COMMENTS COMMENTS <br /> Elm <br /> Test time: <br /> Ullage volume: Material: DW FIBERG <br /> Ullage pressure: Diameter(in): 2.0 <br /> Results: Length(ft): 150.9 <br /> Test psi: <br /> DATA FOR UTS-4T ONLY: Bleedback cc: <br /> Time of test 1: Test time(min): <br /> Temperature: NOT Start time: NOT NOT NOT NOT <br /> Flow rate(cfh): TESTED End time: TESTED TESTED TESTED TESTED <br /> Time of test 2: Final gph: <br /> Temperature: Result: <br /> Flow rate(cfh): Pump type: PRESSURE <br /> Time of test 3: Pump make: FE PETRO <br /> Temperature: <br /> Flow rate(cfh): Impact Valves Operational: YES <br /> COMMENTS COMMENTS <br /> iL I 1 11 <br /> Printed 03/10/2010 08:48 ACRAMER <br />
The URL can be used to link to this page
Your browser does not support the video tag.