My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 9:09:56 AM
Creation date
6/3/2020 9:59:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHEET INDEX MAR 9 cD <br /> a) <br /> ' F-1------ -------- -------- --------- ------- ---------TITLE SHEET/SITE PLAN ENVIRONMENTAL HEALTH N <br /> DEPARTMENT <br /> F`2- - - - DETAILS Ln <br /> aC <br /> f � ' <br /> PROJECT DATA <br /> ' t 4 <br /> PROJECTIRW CHEVRON PRODUCTS COMPANY #208118 <br /> ,.J <br /> II, I PROJECTADDfiW: 3355 E, HAMMER LANE, STOCKTON CA 95121 ` 00 <br /> N 9q'44'1 7 328.88'_ _ PARCB. 126-180-07 A\ U L�y <br /> i �iY d- <br /> FACNltYOWNEIV CHEVRON PRODUCTS CO. a <br /> PROPERTY OWNER 6001 BOLLINGER CANYON ROAD, SAN RAMON CA 94583 yV <br /> r ® BUILMCODM 2016 CBC: CALIFORNIA BUILDING CODE t!J <br /> 2016 CMC: CALIFORNIA MECHANICAL CODE L0 <br /> ® 2016 CPC: CALIFORNIA PLUMBING CODE C) -0 <br /> 00 <br /> \O o \ 2016 CEC: CALIFORNIA ELECTRICAL CODE a <br /> \ f� oo \ aI 2016 CFC: CALIFORNIA FIRE CODE <br /> \/ 2016 CALIFORNIA CODE FOR BUILDING CONSERVATION <br /> oo 2016 CALIFORNIA EFFICIENCY STANDARDS <br /> Oo� 2017 NFPA 30, NFPA 407, NFPA 70, ASCE 7-10 <br /> 06 <br /> 0 11/12 9/10 B GPID L OF 6 N SCOPE OF WORK <br /> 06 <br /> O 8 I ® (1) - 20,000 GALLON UNLEADED UNDERGROUND STORAGE TANK AND (1) 15,000 GALLON <br /> N <br /> T UNDERGROUND STORAGE TANK TO REMAIN. <br /> O REMOVE (6) EXISTING DISPENSERS, EXISTING UNDER DISPENSER CONTAINMENTS (UDC'S) TO REMAIN <br /> O O REPAIR ALL EXISTING PRODUCT AND VAPOR PENETRATIONS WITH SPLIT PENETRATIONS TO ALL <br /> DISPENSERS. <br /> 6/6 7/s McDONALD'S /CHEVRON o <br /> i INSTALL (6) NEW WAYNE OVATION BLENDING 3+0 DISPENSEFS WITH NEW CONVERSION FRAMES <br /> 0 1511 2C BUILDING Z L) <br /> N I J MODIFY PIPING AND ELECTRICAL AS NECESSARY. W <br /> o <br /> O INSTALL NEW HANGING HARDWARE, <br /> W j N <br /> INSTALL NEW SPANNERS AND CONNECT ALL ELECTRICAL. z <br /> 0 <br /> COLD START VEEDER R00T SYSTEM TO MONITOR EXISTING TANKS AND NEW DISPENSERS, <br /> [77 1 1111 <br /> o 3/4 1/2 H11010 _ 0 ( O START UP, PURGE, AND CALIBRATE ALL SYSTEMS. <br /> r <br /> �. o O PERFORM ALL REQUIRED TESTINI <br /> �A <br /> 'T TS <br /> n <br /> li <br /> OMPACT COMPACT '® - <br /> GENERAL NOTES: <br /> o <br /> 1. ALL WORK SHALL BE IN ACCORDANCE WITH THE CURRENT APPLICABLF EDITIONS OF THE CALIFORNIA BUILDING CODE, CALIFORNIA - <br /> PLUMBING CODE, CALIFORNIA MECHANICALCODE, CALIFORNIA FIRE CODE, CALIFORNIA ELECTRICAL CODE, CAL-OSHA CONSTRUCTION <br /> SAFETY ORDERS, AND ALL OTHER APPLICABLE STATE, CITY AND COUNTY ORDINANCES. <br /> 2. CONTRACTOR IS RESPONSIBLE FOR CONTACTING UNDERGROUND SERVICE ALERT USA 1-800-227-2600 OR AT LEASTT 2 <br /> WORKING DAYS PRIOR TO THE START OF WORK <br /> I 3. SITE SPECIFIC ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, ELEVATIONS AND <br /> f EQUIPMENT LOCATIONS. <br /> 4, ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIE.D BEFORE BIDDING. ANY DISCREPANCIES SHALL BE <br /> CALLED TO THE ATTENTION OF THE OWNERS REPRESENTATIVE FOR HIS/HER DECISION PRIOR TO FINALIZING BIDS AND START OF <br /> WORK. 00 <br /> 5. CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES, BOTH PUBLIC AND PRIVATE, WHICH ARE TO REMAIN UNLESS NOTED <br /> OTHERWISE. CONTRACTOR SHALL REPAIR OR REPLACE, TO THE OWNERS SATISFACTION, ANY EXISTING FACILITIES WHICH ARE 0 <br /> o DAMAGED AS RESULT OF CONTRACTOR'S OPERATIONS. <br /> — — — — — — — — — _ — — .._. — — — — — — _ — ..— — — — — — — — — — � 6. . <br /> O <br /> 04 <br /> ALL WORK AREAS SHALL BE ADEQUATELY BARRICADED THROUGHOUT THE CONSTRUCTION PERIOD <br /> 306.00' q� FOR EXCAVATIONS F TRENCHES '-0" R MORE I <br /> S 89°4A'17° W _ 7. CONTRACTOR SHALL OBTAIN NECESSARY PERMITS FROM APPLICABLE AGENCIES 0 E CAV ONS 0 ENC ES 5 0 N <br /> DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. Z <br /> B. CONTRACTOR TO PERFORM ALL REQUIRED VAPOR RECOVERY TESTING PER CARB VR-204 AND LOCAL AIR POLLUTION CONTROL <br /> AUTHORITY AND FORWARD RESULTS TO OWNER AND JURISDICTION AS SPECIFIED IN THE PERMIT CONDITIONS. <br /> 9. ALL MATERIALS SHALL BE COMPATIBLE FOR USE WITH THE INTENDED PURPOSE PER NATIONALLY RECOGNIZED CODES, LOCAL CODES LZ U W <br /> AND GOVERNING AUTHORITIES, <br /> HAMMER LANEUj <br /> 10. FUELING SYSTEM TO BE INSPECTED PER LOCAL REGULATING AGENCIES AND BY OWNER'S REPRESENTATIVE PRIOR TO BEING PLACED F- J N <br /> BACK INTO SERVICE <br /> U <br /> Q LCO <br /> 11. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS SHALL BE FORWARDED TO AND APPROVED BY J � W <br /> Cl- D <br /> GOVERNING AGENCY PRIOR TO TANK SYSTEM BEING PLACED INTO OPERATION (AS APPLICABLE). WLj <br /> VICINITY MAP J a z <br /> W <br /> _ z <br /> CL <br /> Zoo <br /> W <br /> Lf7 <br /> G <br /> m " °- W Un 0 <br /> Ltakeman Dr In <br /> Ta'a'fn5hen 6[}1 t U) C� hr7 CrD <br /> dvag��ep�Etr �I�,4Q�'� <br /> g <br /> - ' V"4atmz�rs�uyaerrgTOier Q <br /> 4 <br /> LaWE':sHama - <br /> drn�Tcrve:nen: <br /> Nissana(�tsrc-tiEa?Tf� - <br /> SITE PLAANrceM l <br /> 'che.Ta^ T23SS CA%t Hammer Lorm- <br /> SCALE: 1"=10' DRAWN BY: MW <br /> nmei Ln E'Hanm€rL� , Ws1 h=-t�T E18etnmerLn" REVIEWED BY: LM <br /> IMPORTANT NOTICE AQMD INFORMATION. IMPORTANT NOTICE DATE: 3.3,17 <br /> 3 JOB NO: #17-405093.1 <br /> Section 4216/4217 of the Government Section 4216/4217 of the Government - <br /> Code requires a Dig Alert Identification Code requires a Dig Alert Identification ° <br /> Number be issued before a i Numt;er be issued before a 7? SHEET ., <br /> Permit to Excavate will be valid NUMBER OF (E) FUELING STATIONS 12 Permit to Excavate will be valid Dolt=TTee�# � <br /> For your Dig Alert ID Number Call U / NUMBER OF (E) GASOLINE NOZZLES 12 For your Dig Alert @ Number Call L{ - StaCxtbR D049cT <br /> UNDERGROUND SERVICE ALERT S , UNDERGROUND SERVICE ALERT S Chq'SIIII jz pRam <br /> A NUMBER OF (N) FUELING STATIONS 12 ��1 <br /> 1 — <br /> Bo —227-2600 <br /> 1 -800-227-2600 0 <br /> 0 NUMBER OF N GA OLINE NOZZLES 120 <br /> 1 1 30 S <br /> 0 5 0 20 ( ) <br /> or 811 or 811 TC�ttetT 99,iH,ngtitnOaatFaslnTV, <br /> For Underground Locating SCALE 1 10' <br /> " NUMBER OF DIESEL NOZZLES D For Underground Locating <br /> = <br /> 2 Working Days before You Dig - 2 Working Days before You Dig w <br />
The URL can be used to link to this page
Your browser does not support the video tag.