My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 9:09:56 AM
Creation date
6/3/2020 9:59:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> INSTALLING A NEW DISPENSER <br /> ` In some situations you may encounter existing conduits that are <br /> CRITIC <br /> located outside the existing UDC's opening / water splash. You may <br /> [be required to purchase additional components. Refer to the Conversion Frame Evaluation Form. <br /> YOU ARE NOT AUTHORIZED TO MODIFY THE CONVERSION <br /> FRAME IN ANY WAY !! Contact Bravo Systems immediately at 800-AT-BRAVO to <br /> begin a factory evaluation and to obtain compliant directions tailored to your specific application. <br /> Al - Remove existing dispenser from its mounting points. <br /> A2 - Align and secure conversion frame to the island / concrete with minimum 112"o diameter bolts. <br /> For Non-Bravo Sumps -A minimum of four (4) anchor bolts must be secured directly to concrete. <br /> Use provided plastic caps to plug all concrete anchoring bolt holes after they are fastened. <br /> Concrete anchoring bolts must not be corroded or compromised and should be embedded adequately. <br /> Follow your anchor bolt product manual or manufacturer's recommendations to install them properly. <br /> A3 - Pre-plumb all product inlets and vapor recovery line with offsets and/or rigid pipe and elbows <br /> as necessary. Adjust electrical conduits to line up with the new dispenser as necessary. <br /> A4 - Position and bolt down the dispenser to the conversion frame with the anchor bolts provided. <br /> 0 <br /> Dispenser Napo,41 <br /> �e <br /> BRAVO <br /> Dispenser OFFSET <br /> Anchor Bolt ==-= <br /> BRAVO <br /> OFFSET <br /> Concrete -- Concrete Anchor <br /> Anchor Bolts <br /> Plate o <br /> d a, 4 .4 ° <br /> A . dd <br /> °d vd 4 BRAVO BOX ° <br /> q d ° <br /> FOR OLD Equipment shown is for <br /> DISPENSER illustration purposes only <br /> and is not a reference <br /> for your layout within <br /> the hydraulic cabinet <br /> . . . . .. .. .. ... <br /> 2 ii-CONV-82000-ConversionFrame-14A-8/20/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.