Laserfiche WebLink
0 0 <br /> INSTALLING A NEW DISPENSER <br /> ` In some situations you may encounter existing conduits that are <br /> CRITIC <br /> located outside the existing UDC's opening / water splash. You may <br /> [be required to purchase additional components. Refer to the Conversion Frame Evaluation Form. <br /> YOU ARE NOT AUTHORIZED TO MODIFY THE CONVERSION <br /> FRAME IN ANY WAY !! Contact Bravo Systems immediately at 800-AT-BRAVO to <br /> begin a factory evaluation and to obtain compliant directions tailored to your specific application. <br /> Al - Remove existing dispenser from its mounting points. <br /> A2 - Align and secure conversion frame to the island / concrete with minimum 112"o diameter bolts. <br /> For Non-Bravo Sumps -A minimum of four (4) anchor bolts must be secured directly to concrete. <br /> Use provided plastic caps to plug all concrete anchoring bolt holes after they are fastened. <br /> Concrete anchoring bolts must not be corroded or compromised and should be embedded adequately. <br /> Follow your anchor bolt product manual or manufacturer's recommendations to install them properly. <br /> A3 - Pre-plumb all product inlets and vapor recovery line with offsets and/or rigid pipe and elbows <br /> as necessary. Adjust electrical conduits to line up with the new dispenser as necessary. <br /> A4 - Position and bolt down the dispenser to the conversion frame with the anchor bolts provided. <br /> 0 <br /> Dispenser Napo,41 <br /> �e <br /> BRAVO <br /> Dispenser OFFSET <br /> Anchor Bolt ==-= <br /> BRAVO <br /> OFFSET <br /> Concrete -- Concrete Anchor <br /> Anchor Bolts <br /> Plate o <br /> d a, 4 .4 ° <br /> A . dd <br /> °d vd 4 BRAVO BOX ° <br /> q d ° <br /> FOR OLD Equipment shown is for <br /> DISPENSER illustration purposes only <br /> and is not a reference <br /> for your layout within <br /> the hydraulic cabinet <br /> . . . . .. .. .. ... <br /> 2 ii-CONV-82000-ConversionFrame-14A-8/20/2014 <br />