Laserfiche WebLink
• • <br /> INSTALLATION MATERIALS CHECKLIST <br /> ❑ Tools & equipment ❑ Offsets, elbows, nipples, unions, Etc.. <br /> ❑ Concrete anchor bolts * ❑ Plastic caps (sow plugs) for nuts / bolts <br /> ❑ Dispenser anchor bolts <br /> �c S. Bravo Systems, Inc. does not include Concrete Anchor Bolts with its Conversion Frames. <br /> PRE-INSTALLATION CHECKLIST <br /> ❑ Ensure that you have all your permits in order, including your Bravo Certification Card. <br /> ❑ Conversion Frame is free of damage? <br /> ❑ Physically check the Dispenser, Sump and Conversion Frame drawings before installation? <br /> If either of the two scenarios below exist, call Bravo immediately at 323-888-4133 . <br /> > The existing conduits are concreted in just outside the water splash lip. <br /> > The existing conduits run vertically very close to the UDC's water splash lip or I.D. opening. <br /> INSTALLATION CHECKLIST <br /> ❑ Dispenser was carefully removed and any spills contained and cleaned up? <br /> ❑ Drawings for all components are on-site and have been reviewed for any problems? <br /> ❑ Conversion Frame is bolted to the island or concrete with minimum 1/2"o bolts? <br /> ❑ If a non-Bravo UDC is existing, were a minimum of 4 either existing or new anchor bolts <br /> used to secure the conversion frame to the concrete? <br /> ❑ All electrical conduits are adjusted correctly to mate with the new dispenser? <br /> ❑ All product inlets are pre-plumbed with approved offsets, elbows, pipe, etc..? <br /> ❑ Dispenser was carefully lined up and securely bolted to the Conversion Frame? <br /> ❑ Conversion Frame was inspected for dents or damage? <br /> 4 ii-CONY-B2000-ConversionFrame-14A-8/20/2014 <br />