Laserfiche WebLink
SECTI 2 ♦ System Preparation <br /> 1. Determine the length of the primary pipe. <br /> Scarf O.D.of pipe so that the <br /> fitting halves fit together I 2. Determine the fittings to be used on each end of the <br /> 0 when assembled by hand. <br /> — + _ primary pipe. Find the corresponding numbers in <br /> Table 2.2.1 (X1 for first fitting, and X2 for the second <br /> Note: Sanded pipe ends fitting); subtract them from the OAL. This will be the <br /> must always fit snugly into length of the containment pipe. <br /> the socket of the fitting. <br /> Example: If 2" (50 mm)product pipe is 20 ft., 6 in. (6248 <br /> mm)long, and you are using a 90° elbow on one end and <br /> If there is a gap between the fitting a 45°elbow on the other end, then cut the containment <br /> halves when assembled by hand, I pipe 20 ft., 2 in. (6147 mm)long. <br /> pipe must be scarfed more. <br /> + Calculation: <br /> 20'6" -2V (fitting#1, 90°elbow) <br /> FIGURE 2.2.2 - 1X" (fitting#2, 45°elbow) <br /> =20'2" <br /> 2.2.3 Pipe Assembly or <br /> The containment pipe must be positioned over the prod- 6248 mm -54 mm (fitting#1, 90°elbow) <br /> uct pipe before bonding the product pipe. Pre-installa- -48 mm(fitting#2, 45°elbow) <br /> tion of the secondary containment pipe (only) is best ac- =6147 mm <br /> complished at the same time the product pipe is dry-fitted <br /> together. This will speed up installation and prevent un- WARNING: Since every insertion of the primary piping <br /> necessary delays. may vary, dry fit all secondary containment connections <br /> to make sure that the insertion is approximately 3". Be <br /> Where possible, sure that the containment pipe is not inserted too far into <br /> temporarily place the containment fitting. The glossy O.D. of the pipe <br /> containment fit- should not be seated in the containment fitting. <br /> ting halves around ° ° ° ° <br /> the product fit __LZZ <br /> - <br /> tings. This mea- K Product Pipe <br /> sure will help pre- ° ° ° Containment <br /> vent foreign Pipe <br /> material from en- ° Lay out system X1 <br /> tering the contain- with all dry joints <br /> ment pipe (see Fig. <br /> 2'2'3)' FIGURE 2.2.3 L OAL <br /> The containment <br /> fittings should be installed and the containment system X2 <br /> tested after the product piping system has been tested. — — — — _ <br /> Note: Do not leave rocks, pea gravel, sand, or other de- <br /> bris in the containment piping system. <br /> TABLE 2.2.1 Determining Length of <br /> Typically,the length of the containment pipe is deter- Containment Pipe <br /> mined from the following formula: <br /> L=CAL of product pipe-X1 -X2 Product Coupling, 45° Termination <br /> Pipe Size 90°Elbow,Tee Elbow Fitting <br /> Where: X1 =fitting#1 (in.) (mm) (in.) (mm) (in.) (mm)', (in.) (inm) <br /> X2=fitting#2 2 50 2% 54 1 48 4% 121 <br /> Using Table 2.2.1 and Fig. 2.2.4 as a guide, proceed as fol- 3 75 1% 48 2% 57 4% 121'. <br /> lows: 4 100 1% 48: 2% 54 6 152 <br /> RED THREAD IIA Pipe br Fittings — 23 <br />