My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
120
>
2300 - Underground Storage Tank Program
>
PR0515365
>
COMPLIANCE INFO_1999-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 10:06:56 AM
Creation date
6/3/2020 9:59:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2005
RECORD_ID
PR0515365
PE
2361
FACILITY_ID
FA0012107
FACILITY_NAME
A TEICHERT & SON INC*
STREET_NUMBER
120
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342006
CURRENT_STATUS
01
SITE_LOCATION
120 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0515365_120 FRANK WEST_1999-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 8 ♦ Testing Recommendations for Seco Bary Containment Piping <br /> FIGURE 2.7.1 <br /> Flexible <br /> Connector <br /> O <br /> 10 prig <br /> (0.069 MPa) <br /> FIGURE 2.7.2 FIGURE 2.8.1 <br /> wrapping a heating collar over the saddle outlet as Smith Fiberglass Products recommends testing 3" and <br /> shown in Fig.2.7.2. For outdoor installations,place 4" (75 mm and 100 mm) secondary containment pip- <br /> wind shields on both sides of the saddle to prevent heat ing systems with air at pressures not to exceed 10 psig <br /> loss. Total cure time must be two hours for saddles. (0.069 MPa). The most convenient place to introduce <br /> Allow the saddle to cure and cool down to ambient tem- air for the containment piping pressure test is at the <br /> perature before bonding or threading in the side run. Do threaded outlet located on the termination fitting near <br /> not use chemical heat packs to cure saddles. the underground storage tank (see Fig. 2.8.1). It is ad- <br /> vantageous to leave the system pressurized until the <br /> ATIONS FOR SEC- installation is completed in order to monitor for possi- <br /> ble damage to the containment piping system during <br /> Prn <br /> additional construction. The low pressure and low vol- <br /> ing, 3" and 4" (75 mm and 100 ume of the secondary containment piping system <br /> pressure tested by installing an makes this air test a safe procedure if normal safety <br /> auge and a nipple in the%" precautions are followed. Refer to air test safety pre- <br /> tlet of a termination fitting(see Fig. 2.8.1). If cautions in Section 1.7.3. <br /> ing is to be installed temporarily,use care not <br /> to over tighten when installing the steel pipe threads. Note: 6" (150 mm) secondary containment piping is not <br /> Fiberglass threads may be damaged when removing the UL Listed,but may be air tested when normal safety pre- <br /> steel threads if over tightened. Use soft-set, non-metallic cautions are followed. <br /> thread dope only. <br /> RED THREAD IIA Pipe & Fittings — 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.