Laserfiche WebLink
0 0 <br /> 3.7.3.4.Soap all service fittings and manways.Watch for active 3.8.3.PRIMARY-TANK AIR TEST OF BASE TANK <br /> air bubbles,which indicate a leak. 3.8.3.1.Install the test manifold in the open service fitting. <br /> Connect the pressure source to the test manifold on the base <br /> 3.7.3.5.Monitor the pressure for one hour. tank.(See FIGURE 3-3 and FIGURE 3-11.) <br /> 3.7.4.AIR TEST OF SECONDARY TANK 3.8.3.2. Pressurize the primary tank to 5 psig.Allow the <br /> 3.7.4.1.Attach the quick-disconnect hose assembly from the pressure to stabilize by adding or removing air as necessary. <br /> end-tank monitor fitting to the primary-tank service fitting(with Note: The liquid level will rise during the air test. <br /> a female quick-disconnect fitting in place).This will allow air to transfer <br /> to the interstitial space. (See FIGURE 34 and FIGURE 3-13.) 3.8.3.3.Close the air-supply valve on the test manifold. <br /> 3.7.4.2.Add air as required and stabilize the air pressure in the Disconnect the air-supply line. <br /> total tank system to 5 psig. 3.8.3.4.Soap all service fittings and manways.Watch for active <br /> air bubbles,which indicate a leak. Check the reservoir for <br /> 3.7.5.EXTERNAL SOAP TEST bubbles in the monitoring fluid.(The level of the monitoring fluid <br /> 3.7.5.1.Soap the entire exterior of the tank.Watch for active air bubbles, will naturally rise due to the pressure in the primary tank.) <br /> which indicate a leak.Pay special attention to fitting(s)and <br /> manways. Lift the tank to check the bottom. Do not roll the tank. 3.8.3.5. Monitor the pressure for one hour. Do not release air <br /> pressure. <br /> 3.7.5.2.Monitor the pressure for one hour. 3.8.4.PRIMARY-TANK AIR TEST OF END TANK(S) <br /> 1 3.8.4.1. Install the test manifold in the open service fitting in the <br /> Do not stand under the tank. This could result in death, end compartments.Connect the pressure source to the test <br /> serious personal injury or property damage. manifolds. (See FIGURE 3-3 and FIGURE 3-12.) <br /> 3.8.4.2. Pressurize the primary tank of the end tank(s)to 5 psig. <br /> 3.7.5.3.When the test is completed,carefully release the air Allow the pressure to stabilize by adding or removing air as <br /> pressure from the tank by opening the air-supply valve. necessary. <br /> 3.7.5.4.When the air flow stops,remove the test manifold. Note: The liquid level will rise during the air test. <br /> 3.8. TESTING A DOUBLE-WALL MULTICOMPARTMENT 3.8.4.3.Close the air-supply valve on the test manifolds. <br /> TANK WITH LIQUID-FILLED INTERSTITIAL SPACE Disconnect the air-supply line. <br /> 3.8.4.4.Soap all service fittings and manways.Watch for active <br /> DO not connect air supply di to Me interstitial-space air bubbles,which indicate a leak.Check the reservoir for <br /> monitor fitting.Pressurizing the secondarytank(intersbbal bubbles in the monitor fluid.(The level of the monitor fluid will <br /> by itseff may damage the primary tank or cause naturally rise due to the pressure in the primary tank.) <br /> tank failure. 3.8.4.5. Monitor the pressure for one hour. <br /> 3.8.1. GENERAL 3.8.4.6.When the test is complete,carefully release the air <br /> 3.8.1.1. See FIGURE 3-10 and FIGURE 3-11. pressure from all compartments by opening the air-supply valve. <br /> 3.8.2. PRIMARY BASE TANK(INTERNAL) 3.8.4.7.When the air flow stops, remove the test manifolds. <br /> 3.8.2.1.Keep the tank vertical(the reservoir on top)at all times 3.8.4.8.Check the liquid level in the reservoir. It should be at <br /> or the liquid(brine)may drain from the reservoir. approximately the same level as the pretest level. <br /> 3.8.2.2.Remove all temporary service fitting plugs,redope,and 3.8.5. SECONDARY TANK(EXTERNAL) <br /> reinstall all fitting plugs except one for each compartment <br /> (needed for test manifolds)and the fitting on the reservoir. Install ACAUTION <br /> permanent plugs in all unused openings. Do not open the Do not conned air supply di to the interstitial-space <br /> monitor fitting (if present) or monitoring fluid could be lost. monitor ftng.Pressurong the secondary tank(interstitial <br /> space)by itself may damage the primary tank or cause <br /> 3.8.2.3.Check the liquid level in the reservoir. It should be tank failure. <br /> about 1/4 full. <br /> 3.8.5.1. Check the exterior of the tank for monitoring fluid. <br /> 3.8.2.4.Visually check the interior of each compartment for (The monitoring fluid is dyed blue to distinguish between <br /> liquid. There should not be any. moisture and monitoring fluid.) If monitoring fluid is found,wipe <br /> the tank dry and verify that the monitoring fluid does not <br /> reappear.Lift the tank to check the bottom.Do not roll the tank. <br /> 8 <br />