Laserfiche WebLink
- <br /> 0 0 <br /> If ownerloperator allows pump or pressure filling of the tank, 21.1 GENERAL <br /> ownerloperator must ensure that the tank is not equipped mfth 2111.After installation,tank installer must give Installation <br /> overfill protedon,such as anautornaAc shut-off device Crie& Manual totank owner. <br /> 11bat valve Ownerloperator must notify whoever will fill the tank <br /> Mat aUtdinafic shut-off is required onMedL*Ihveiy 2112. After installation,tank owner must retain Installation <br /> truck 0Qprevent aQoverfill and that overfilling the tank while Manual for future reference hooperating guidelines. <br /> under pressure could cause tank failure even ff the tankperit is <br /> unrestricted Failure to Wow these instructions each ftme the <br /> tank is filled could cause amoverfill,oveipressurization or tank <br /> failure,and could result indeath,serious personal injuty' or <br /> property damage. <br /> 1M.3.ENTERING TANK <br /> 18�.1.Donot allow anyone huenter the tank unless ithas been <br /> properly emptied and vented,and unless the person entering <br /> the tank has been trained inconfined-space entry procedures <br /> and applicable OSHA regulations. <br /> L_ AWARNING <br /> Improper tank entty could cause fire, explosion or <br /> asphyxi- <br /> ation, and could result in death, serious personal injury' or <br /> property damage. <br /> 19.1. GENERAL <br /> 1O.1.1.Each product incovered byproduct-specific limited <br /> warranties,which contain operating guidelines and parameters <br /> that should bereviewed eeapplicable.Copies ufthe limited <br /> warranties are available upon request from the UST coordinator <br /> atthe plant nearest you. <br /> 20.1. GENERAL <br /> 2O.1.1.Supplemental materials,which may apply buspecific <br /> installations and/or conditions,are available upon request from <br /> the UST coordinator otthe Xerxes plant nearest you orfrom <br /> technical support atXerxes Minneapolis,esapplicable. <br /> 20.1.1.1.Among those materials available from the UST <br /> coordinator are: <br /> ° Adh*oive/Saa|ant|notruobono. <br /> ° Fiberglass Tank Backfill Guidelines, <br /> ~ Gasket Change-Out Instructions, <br /> ° NmwYhrkQtyDoub|e-We||lank\nsta||ution/TeotingSupplement, <br /> ° OMNTECInstallation Instructions, <br /> ° Preinstallation ThotingSupplement:Triple-Wall Tank, <br /> ° Recertification Service, <br /> ° TRUCHEK8Hydrostatic Monitoring System For Xerxes DVVT-||. <br /> 2U.1.1.2.Among those materials available from technical <br /> support atXerxes Minneapolis are: <br /> ° Alternate Backfill Supplemental\nntmodonu. <br /> ° Deep Burial Guidelines, <br /> ~ Split Backfill Supplemental Instructions. <br /> 25 <br />