Planning Probe and Sensor Installation New Sites <br /> Planning Sensor Installation <br /> New sites <br /> Prior to site paving,the contractor should diagram,all proposed conduit runs between <br /> the TLS Console's intended location and its deployed sensors and probes.Your site <br /> diagram will help you to calculate conduit and wiring lengths,and necessary quantities <br /> of junction boxes,sealing boxes,clamps,brackets,etc. <br /> Reminder:to ensure optimum signal strength,plan sensor and probe wiring lengths so <br /> that there will be no splices between the field junction box connection and the <br /> interface module connection in the TLS Console.Every splice in the hazardous area <br /> requires the use of an epoxy sealing kit which should not be pulled through the conduit <br /> and must be located in a separate waterproof,sealed junction box. <br /> Throughout this planning process and in the actual installation,you must follow the <br /> latest National Electric Codes,Federal,state,and local codes,as regards conduit type, <br /> depth below grade,sealing,grounding,wire capacities,etc. <br /> Figure 4 illustrates a simplified site deployment of probes and sensors.Actual probe <br /> and sensor locations as well as required conduit runs will vary from site to site. <br /> 11 <br />