My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
120
>
2300 - Underground Storage Tank Program
>
PR0515365
>
COMPLIANCE INFO_1999-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 10:06:56 AM
Creation date
6/3/2020 9:59:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2005
RECORD_ID
PR0515365
PE
2361
FACILITY_ID
FA0012107
FACILITY_NAME
A TEICHERT & SON INC*
STREET_NUMBER
120
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342006
CURRENT_STATUS
01
SITE_LOCATION
120 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0515365_120 FRANK WEST_1999-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a 0 <br /> Probe and Sensor Installation Probe and Sensor Manhole Installation <br /> Probe and Sensor Installation <br /> Probe and Sensor Manhole Installation <br /> At each underground probe and sensor location,install a 14-inch minimum diameter <br /> approved manhole according to the manufacturer's instructions(Note:probes should <br /> be located at least 24 inches from the submersible pump to avoid erroneous probe <br /> readings when the pump is running). <br /> Position the manhole so that there is necessary clearance for junction box installation <br /> and wiring. <br /> Probe and Sensor Installation Diagrams <br /> Each probe and sensor supplied by Veeder-Root is accompanied by an installation <br /> manual.For reference only,Figure 5 contains a composite of the installation diagrams <br /> taken from individual probe and sensor installation manuals.When installing Veeder- <br /> Root probes and sensors you must consult and adhere to the procedures given in the <br /> installation manual shipped with that probe or sensor. <br /> 14"min.dia. <br /> �� manhole <br /> Cord grip seal <br /> supplied with probe <br /> Concrete slab ' <br /> or packed earth a . <br /> per NFPA 80 s— <br /> Epoxy seal per NFPA spec <br /> Riser pipe-4"API schedule 40 1/2"rigid conduit(to Console) <br /> (To prevent erroneous probe readings, 18"min. <br /> install probe riser a minimum of 24" see Weatherproof junction <br /> from the submersible pump.) note box with 1/2"NPT <br /> threads(16 cubic inch <br /> minimum) <br /> "Note: <br /> Increase this minimum dimension if the tank <br /> diameter does not match the probe length. -- Split-ring collar(optional) <br /> (Example: a 7'6" dia. tank will use an 8' — See detail below <br /> probe. The extra probe height will be lodged <br /> in the riser pipe, which must be 6" longer <br /> than the minimum in order to provide room. <br /> Top view <br /> 0 � <br /> Magnetostrictive probe Side view <br /> Split-Ring Collar <br /> probesprb-teps Tank <br /> Item A.-Typical Mag Probe Installation-Underground Storage Tank(UST) <br /> Figure 5. TLS-350 Probe and Sensor Installation Diagrams <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.